0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The New JTI Headquarters in Geneva - an Iconic Shape in the Swiss Landscape

The New JTI Headquarters in Geneva - an Iconic Shape in the Swiss Landscape
Autor(en): , , , ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 416-424
DOI: 10.2749/222137815818357395
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

The new JTI Headquarters constitute a novel architectural landmark in Geneva. The nine-storey building stands on a triangular shaped parcel; it is characterized by three main tubes creating an open...
Weiterlesen

Bibliografische Angaben

Autor(en): (SKIDMORE, OWINGS & MERRILL LLP, Chicago, USA)
(INGENI SA, Carouge, Switzerland)
(INGENI SA, Carouge, Switzerland)
(INGENI SA, Carouge, Switzerland)
(SKIDMORE, OWINGS & MERRILL LLP, Chicago, USA)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 416-424 Anzahl der Seiten (im PDF): 9
Seite(n): 416-424
Anzahl der Seiten (im PDF): 9
Jahr: 2015
DOI: 10.2749/222137815818357395
Abstrakt:

The new JTI Headquarters constitute a novel architectural landmark in Geneva. The nine-storey building stands on a triangular shaped parcel; it is characterized by three main tubes creating an open environment on the ground floor which boasts a public pedestrian passage. The facade trusses create an impressive 60-meter-span cantilever on the north-east side. On the south-west side, the building also lifts off the ground in a bridge-like fashion spanning over 80 meters. The main frame is composed of three-dimensional steel trusses supporting light-weight composite slabs without intermediate supports. Specific procedures, namely, controlled unpropping, jacking and temporary tie-down of the structure, allowed for safe cladding installation and control of building deformations. Advanced natural fire analysis led to a consistent reduction of fireproofing measures of the steel floor framing.

Stichwörter:
Kragarm

Bauwerke und Projekte