Montreal – Aquatic Complex for 2005 FINA World Championships

 Montreal – Aquatic Complex for 2005 FINA World Championships
Autor(en):
Beitrag für IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, veröffentlicht in , S. 574-575
DOI: 10.2749/222137810796062860
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.1 MB

The existing open air aquatic complex on Sainte-Hélène Island in Montréal was chosen to host 2005 Aquatic Sports World Championships. The old concrete pools built in 1953 had to be replaced by new ...
Weiterlesen

Bibliografische Angaben

Autor(en):
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Veröffentlicht in:
Seite(n): 574-575 Anzahl der Seiten (im PDF): 8
Seite(n): 574-575
Anzahl der Seiten (im PDF): 8
Jahr: 2010
DOI: 10.2749/222137810796062860
Abstrakt:

The existing open air aquatic complex on Sainte-Hélène Island in Montréal was chosen to host 2005 Aquatic Sports World Championships. The old concrete pools built in 1953 had to be replaced by new structures and the new pools and bleachers had to fit in the existing site. In the new layout, the swimming pool was relocated which led to some problems due to soil conditions. The soil was sensitive and heterogeneous therefore differential settlements and resulting lateral displacements had to be considered in the design in order to respect the strict dimensional criteria for Olympic pools. To guarantee the quality of works within a very tight schedule, the upper section of the walls was made of prefabricated steel panels. As a result, the rigid continuous “box” originally formed by the concrete corridor around the pool was lost. Consequently, a combination of soil consolidation, interaction of soil-structure and phasing of construction-backfilling became part of design.

Stichwörter:
Verfüllarbeiten