Modelling the Construction of Cable Stayed Bridges Stressed with the Strand by Strand Technique

 Modelling the Construction of Cable Stayed Bridges Stressed with the Strand by Strand Technique
Autor(en): , ORCID
Beitrag für IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, veröffentlicht in , S. 1058-1064
DOI: 10.2749/guimaraes.2019.1058
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.8 MB

The temporary supports erection method is the most common way of building cable-stayed bridges. In this technique the bridge deck is first built over a set of temporary and permanent supports. Then...
Weiterlesen

Bibliografische Angaben

Autor(en): (University of Castilla-La Mancha, UCLM, Ciudad Real, Spain)
ORCID (Universitat Politècnica de Catalunya, BarcelonaTech, UPC, Barcelona, Spain)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Veröffentlicht in:
Seite(n): 1058-1064 Anzahl der Seiten (im PDF): 7
Seite(n): 1058-1064
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/guimaraes.2019.1058
Abstrakt:

The temporary supports erection method is the most common way of building cable-stayed bridges. In this technique the bridge deck is first built over a set of temporary and permanent supports. Then, during the tensioning process, the stays are successively placed and tensioned by the jacks and the deck is raised from the temporary supports. Several variants of this method are the launching of the bridge and the rotation method. This paper proposes an algorithm to calculate and to control the construction of such bridges when the strand by strand tensioning technique is used. It is based on the unstressed length of the stays concept. The use of such concept enables a fast and direct simulation of construction stages by analysing independent Finite Element Models. As there is no need of superposition of models it is a very convenient way for construction supervision.

Stichwörter:
Schrägseilbrücken Analyse