0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

LaGuardia Airport Design Build Extends Runway Decks for Safety Improvement

 LaGuardia Airport Design Build Extends Runway Decks for Safety Improvement
Autor(en): , ,
Beitrag für IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, veröffentlicht in , S. 2229-2238
DOI: 10.2749/newyork.2019.2229
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.11 MB

Land is scarce near LaGuardia airport, a major and unique component of NYC's urban infrastructure, and the safety of air passengers and neighboring Queens NY residents was of paramount importance i...
Weiterlesen

Bibliografische Angaben

Autor(en): (Mueser Rutledge Consulting Engineers)
(Mueser Rutledge Consulting Engineers)
(Mueser Rutledge Consulting Engineers)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Veröffentlicht in:
Seite(n): 2229-2238 Anzahl der Seiten (im PDF): 10
Seite(n): 2229-2238
Anzahl der Seiten (im PDF): 10
DOI: 10.2749/newyork.2019.2229
Abstrakt:

Land is scarce near LaGuardia airport, a major and unique component of NYC's urban infrastructure, and the safety of air passengers and neighboring Queens NY residents was of paramount importance in the design. The challenge of expanding the runways was met with design-build for both quick and efficient design and construction which could also accommodate future regional growth.

The purpose of the LGA Runway Extension Project is to extend the existing runways into Flushing Bay as a safety area improvement to support Engineered Material Arresting System (EMAS) - a crushable material installed at the runway ends to increase safety by reducing the risk of a plane overrun during takeoff.

The new runway deck extensions are marine concrete structures which utilize precast prestressed pile caps with a composite precast deck and CIP concrete topping slab. The concrete decks are supported by 250 ton steel pipe piles with coatings, wraps and zinc anodes for corrosion protection.

This paper provides a description of the runway extensions and a detailed account of technical and logistical challenges overcome: deck design for aircraft and impact load, replacing the Approach Lighting Systems, optimizing the pile hammer selection and coordination with the PANYNJ, FAA and stakeholders.