0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

An Interactive Construction Deployment Planning Model for the SKA Project

An Interactive Construction Deployment Planning Model for the SKA Project
Autor(en): ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 580-588
DOI: 10.2749/stockholm.2016.0559
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.2 MB

TheSquare Kilometre Array (SKA)is a global project to build the world’s largest telescope that stretches over at least 3000 km. This paper presents an interactive decision support tool which...
Weiterlesen

Bibliografische Angaben

Autor(en): (Stellenbosch University, South Africa)
(Stellenbosch University, South Africa)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 580-588 Anzahl der Seiten (im PDF): 9
Seite(n): 580-588
Anzahl der Seiten (im PDF): 9
Jahr: 2016
DOI: 10.2749/stockholm.2016.0559
Abstrakt:

TheSquare Kilometre Array (SKA)is a global project to build the world’s largest telescope that stretches over at least 3000 km. This paper presents an interactive decision support tool which can be used for the planning of the construction of 190 (Phase 1) and 2400 (Phase 2) antenna foundations and other infrastructure. A simulation-based site layout planning (SLP) model is presented. The SLP model facilitates the manual optimization of the site layout through a series of “what if” analyses during the layout of temporary construction facilities in order to minimize site transportation cost/time, site establishment cost and improve the efficiency of material handling on site. The model uses unique concepts to facilitate integration of site layout planning, material supply and project scheduling. The model provides a graphical user interface and 2D visual communication during planning. It can also be applied to other repetitive construction projects such as the vertical construction of a multi-story building, or the linear construction of a road section.