Innovative Slip Form Method for the Construction of Tapered Concrete Pylon of Long-Span Cable Bridge

 Innovative Slip Form Method for the Construction of Tapered Concrete Pylon of Long-Span Cable Bridge
Autor(en): , , , ,
Beitrag für IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, veröffentlicht in , S. 1-6
DOI: 10.2749/222137813815776151
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.26 MB

The construction of the three-dimensional shaped pylons higher than 400 m requires very high technological degree. It is known that the application of the tapered slip form method for the erection ...
Weiterlesen

Bibliografische Angaben

Autor(en):





Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013
Veröffentlicht in:
Seite(n): 1-6 Anzahl der Seiten (im PDF): 6
Seite(n): 1-6
Anzahl der Seiten (im PDF): 6
Jahr: 2013
DOI: 10.2749/222137813815776151
Abstrakt:

The construction of the three-dimensional shaped pylons higher than 400 m requires very high technological degree. It is known that the application of the tapered slip form method for the erection of the concrete pylon of long-span cable bridges offers the advantage of being significantly faster than when applying the auto-climbing system (ACS) form method. Therefore, this study presents the development of an innovative slip form system for pylons with tapered cross-section suing lightweight GFRP panels. Surface wave inspection system is applied on the slip form system for the determination of slip-up time, wireless hydraulic control system is applied for auto rising, and GPS system is used to manage the configuration of pylon. A full-scale test bed was conducted to validate and verify the developed innovative slip form. The full-scale tapered concrete pylon has a hollow shaft and a height of 10 m. The sectional dimension is 4 m × 4 m at the foot and 3.77 m ×

3.6 m at the top. The experimental construction of the tapered pylon using the innovative slip form was conducted successfully. This system is the world’s first application of GFRP slip form panel.

Stichwörter:
Betonpylon

Bauwerkstypen