Hee Seok Kim
- Conceptual Design of Hybrid Cable-Stayed Bridge with Central Span of 1000 m Using UHPC. In: Engineering, v. 5, n. 9 ( 2013). (2013):
- Development of Optimal Structural System for Hybrid Cable-Stayed Bridges Using Ultra High Performance Concrete. In: Engineering, v. 5, n. 9 ( 2013). (2013):
- Development of Highly Efficient Construction Technologies for Super Long Span Bridge. In: Engineering, v. 5, n. 8 ( 2013). (2013):
- Experimental Study on Innovative Slip Form Method for the Construction of Tapered Concrete Pylon of Long-Span Cable Bridge. In: Engineering, v. 6, n. 10 ( 2014). (2014):
- (2013): Innovative Slip Form Method for the Construction of Tapered Concrete Pylon of Long-Span Cable Bridge. Vorgetragen bei: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013.