Gorsa bridge
One Million Clicks, One Thousand Shovels and One Heavy Lift Helicopter
Autor(en): |
Florian Kosche
|
---|---|
Medium: | Tagungsbeitrag |
Sprache(n): | Englisch |
Tagung: | Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014 |
Veröffentlicht in: | Footbridge 2014 - Past, Present & Future |
Jahr: | 2014 |
Abstrakt: |
The foundations were hand crafted, the structural system highly utilised, and the construction made of light-weight aluminium optimized to allow for helicopter lift in in one piece of 53 m. Helpful were high fabrication quality a skilful and physically fit high-altitude work crew, and precise logistical coordination to minimize physical impact at this site during construction. The keys to building this bridge at a remote and extreme site were dedication, experience, the will to challenge boundaries and the ability to find unconventional yet effective solutions together in a balanced constellation between contractor, engineer and architect. |
Stichwörter: |
Aluminium Norwegen
|
Lizenz: | Dieses Werk ist urheberrechtlich geschützt. Der/die Urheber erteilt durch die Veröffentlichung nur das Recht, dieses Werk zu betrachten/lesen und herunterzuladen. Eine weitere Vervielfältigung und Veröffentlichung bedarf der Genehmigung des Urhebers/der Urheber. |
Bauwerke und Projekte
1.77 MB
- Über diese
Datenseite - Reference-ID
10070913 - Veröffentlicht am:
09.12.2014 - Geändert am:
02.06.2021