0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Veröffentlicht in:
Jahr: 2011
Abstrakt:

The Forth Replacement Crossing will be a new road bridge across the Forth Estuary at Queensferry in Scotland. The bridge is approximately 2.6 km long, including a cable stayed structure with 2 main spans each of 650 m and an approach viaduct to the south. The Design and Build contract was awarded on 18 April 2011.

The proposals for construction were prepared according to the contract requirements, and working within the constraints set by the Environmental Statement and Bill of Parliament.

This paper describes the preparation of the winning construction proposal and gives details of how the tender envisioned that the cable stayed bridge and approach viaduct will be built.

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10065228
  • Veröffentlicht am:
    03.10.2011
  • Geändert am:
    05.07.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine