0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design, construction and structural response of a lightweight FRP footbridge

 Design, construction and structural response of a lightweight FRP footbridge
Autor(en): , , ,
Beitrag für IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, veröffentlicht in , S. 2053-2061
DOI: 10.2749/ghent.2021.2053
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.18 MB

This paper presents the design, construction and structural response of a laboratory FRP footbridge. Pultruded elements, Glass-FRP profiles and Carbon-FRP strips, comprise the 10 m long simply supp...
Weiterlesen

Bibliografische Angaben

Autor(en): (Universidad Politécnica de Madrid, ETSI Caminos, Canales y Puertos, Madrid, Spain)
(Universidad Politécnica de Madrid, ETSI Caminos, Canales y Puertos, Madrid, Spain)
(Universidad Politécnica de Madrid, ETSI Caminos, Canales y Puertos, Madrid, Spain; Instituto de Ciencias de la Construcción Eduardo Torroja, CSIC, Madrid, Spain)
(Universidad Politécnica de Madrid, ETSI Caminos, Canales y Puertos, Madrid, Spain)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Veröffentlicht in:
Seite(n): 2053-2061 Anzahl der Seiten (im PDF): 9
Seite(n): 2053-2061
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/ghent.2021.2053
Abstrakt:

This paper presents the design, construction and structural response of a laboratory FRP footbridge. Pultruded elements, Glass-FRP profiles and Carbon-FRP strips, comprise the 10 m long simply supported structure, which linear mass is only 80 kg/m approximately. A value of L/200 (L being the length of the span) was the limit adopted for the long-term deflection at mid-span, and verifications at Ultimate Limit State were carried out according to the recommendations of the FRP manufacturer and the European Guideline to design FRP Structures. To construct the bridge, the following phases were completed: (i) bonding CFRP strips to the GFRP stringers, (ii) connecting the FRP elements, (iii) casting concrete at the support regions, and (iv) installing the deck. Once the construction finished, an experimental static and dynamic campaign was performed to assess the bridge structural behavior. As expected from the design stage, excessive vertical vibrations under different pedestrian actions (walking and bouncing) were measured.

Stichwörter:
Entwurf
Copyright: © 2021 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.