0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design and Construction of Chongqing Lijia Jialing River Bridge

 Design and Construction of Chongqing Lijia Jialing River Bridge
Autor(en): , ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 410-418
DOI: 10.2749/nanjing.2022.0410
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.21 MB

To achieve a cost-effective, rational, and efficient structural system, two traditional structural systems—a continuous rigid frame (CRF) girder bridge and a deck arch bridge—are combined to form a...
Weiterlesen

Bibliografische Angaben

Autor(en): (T.Y. Lin International Engineering Consulting(China) Co., Ltd., Chongqing 401121, China)
(T.Y. Lin International Engineering Consulting(China) Co., Ltd., Chongqing 401121, China)
(T.Y. Lin International Engineering Consulting(China) Co., Ltd., Chongqing 401121, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 410-418 Anzahl der Seiten (im PDF): 9
Seite(n): 410-418
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/nanjing.2022.0410
Abstrakt:

To achieve a cost-effective, rational, and efficient structural system, two traditional structural systems—a continuous rigid frame (CRF) girder bridge and a deck arch bridge—are combined to form a new bridge type—arch-stiffened girder (ASG) bridge. This bridge type fulfil the innovative and unique requirements for the Chongqing Lijia Jialing river bridge. The ASG bridge combines the simplicity of a girder bridge with the elegance of an arch bridge. In terms of structural behaviours, the ASG bridge utilizes the arch to assist the main girder and forms a self-balancing system, significantly reducing the mid-span and side-span girder lengths, and thus optimizing structural performance through increased vertical stiffness and effective control of long-term deflection. This article discusses the major components of the Chongqing Lijia Jialing river bridge's design, construction, load capacity testing, and effects upon completion.

Stichwörter:
Tragwerksentwurf Bauverfahren
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.

Geografische Orte