Cable-roof extension for New San Mames Football Stadium. Erection.
Autor(en): |
Javier Llarena
Armando Bilbao Lourdes Cabezuelo Asís Gutiérrez Rafael Urrutia |
---|---|
Medium: | Tagungsbeitrag |
Sprache(n): | Englisch |
Tagung: | Interfaces: Architecture, Engineering, Science, Annual Meeting of the International Association of Shell & Spatial Structures (IASS), Hamburg, 25-27 September 2017 |
Veröffentlicht in: | Interfaces: Architecture . Engineering . Science |
Jahr: | 2017 |
Abstrakt: | This paper describes the main phases of the construction process and focuses on the staged construction simulation carried out by Idom to check the structure stability during the whole erection of the cable-roof extension designed for the new San Mames football stadium. |