Bridge design. Can a methodological approach be defined to guarantee a good solution?
|
Bibliografische Angaben
Autor(en): |
Héctor Beade-Pereda
(Knight Architects, High Wycombe, UK)
|
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017 | ||||
Veröffentlicht in: | IABSE Conference Bath, April 19-20, 2017 | ||||
|
|||||
Seite(n): | 47-55 | ||||
Anzahl der Seiten (im PDF): | 9 | ||||
Jahr: | 2017 | ||||
DOI: | 10.2749/222137817821232289 | ||||
Abstrakt: |
Every design process is intended to devise a solution (S) to a problem (P). Bridge design is a creative activity, more cognitive (deliberate or spontaneous) than emotional. A sequence of steps where a designer should stop to go from P to S can be set. Although they cannot guarantee that S will be the best of the solutions, following a methodological approach as the one outlined in this article, a good solution which satisfactorily meets all the project requirements shouldn't be a pipe- dream. |
||||
Stichwörter: |
Brückenentwurf
|