Study on Key Construction Procedures of CRD Method for Re Shuitang No.3 Tunnel

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 711
Seite(n): 012074
DOI: 10.1088/1757-899x/711/1/012074
Abstrakt:

Controlling the critical construction steps of the CRD method plays an important role in ensuring construction and ensuring construction safety. When using the CRD method for the construction of the Re Shuitang No. 3 tunnel, through the numerical simulation of the initial support structure and the temporary support structure during the tunnel construction process, it is concluded that the left upper step, the upper right step and the temporary support structure are obviously stressed. Construction steps. According to the analysis results, the surrounding rock of the vault should be strengthened in advance, and the second lining structure should be applied after the surrounding rock is stabilized.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1757-899x/711/1/012074.
  • Über diese
    Datenseite
  • Reference-ID
    10675402
  • Veröffentlicht am:
    29.05.2022
  • Geändert am:
    29.05.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine