0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Strengthening of the West Gate Bridge Approach Span, Melbourne

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 1, v. 12
Seite(n): 14-16
DOI: 10.2749/101686602777965739
Abstrakt:

The West Gate Bridge opened to traffic in 1978 linking Melbourne to the western industrial and residential areas. Known worldwide because of the tragic collapse of the main steel spans, the approach spans are receiving a new lease of life. The construction of additional approach lanes has lead to the need for an additional traffic lane on the existing bridge. As it wasn't originally designed for more than 8 traffic lanes a design check was carried out comparing design loads against current legal vehicle loads. To avoid over stressing the structure the bridges approach structures had to be strengthened.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10003884
  • Veröffentlicht am:
    20.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine