Selecting project delivery methods for water treatment plants
Autor(en): |
Jeffrey Feghaly
Mounir El Asmar Samuel Ariaratnam Wylie Bearup |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Engineering, Construction and Architectural Management, 2020, n. 4, v. 27 |
Seite(n): | 936-951 |
DOI: | 10.1108/ecam-06-2019-0308 |
Abstrakt: |
PurposeThe purpose of this paper is to identify key project delivery method selection factors to assist water industry decision-makers in selecting the most appropriate delivery method for their water treatment plant projects. Design/methodology/approachThe selection factors were identified by compiling and validating key project delivery selection factors across various industries through an extensive literature review and two industry expert workshops. This resulted in the development of a web-based decision-support tool to facilitate project delivery method selection within the water industry. FindingsThe research effort led to the identification of 13 key project delivery method selection factors (seven primary factors and six secondary factors) for water treatment plant projects. These factors were utilized to develop EXPRSS-TP, a pioneering web-based project delivery method decision-support tool for the water industry. Practical implicationsA project delivery method selection process is typically an informal process that may range from days to weeks at a time. Based on this work, the assessment can now be completed in about one hour and provides decision-makers with the most favorable delivery method for their project. And with the new tool that encompasses the new knowledge, not only is the decision reached at an accelerated pace, EXPRSS-TP also documents the entire selection process, allowing for a written and retained record of this key decision and its procedure. Originality/valueThis paper contributes to the exisiting body of knowledge by identifying key project delivery selection factors across numerous industries, assessing and combining them, and finally incorporating them into one comprehensive process. EXPRSS-TP improves the traditional project delivery method selection process and provides evidence-based project delivery method selection recommendations. |
- Über diese
Datenseite - Reference-ID
10576847 - Veröffentlicht am:
26.02.2021 - Geändert am:
26.02.2021