0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Civil Engineering Magazine, , n. 4, v. 46
Seite(n): 86-89
Abstrakt:

The six-lane highway bridge between Rio de Janeiro and Niteroi, Brazil, is 8.25 miles (13.3 km) long. There are 5.5 miles (8.9 km) constructed over the open waters of Guanabara Bay. The central navigation spans are comprised of three span continuous steel girder with spans of 65, 984, 656 ft (200, 300, 200 m), while approach spans are of segmental precast prestressed concrete. The orthotropic deck navigation spans feature a world record girder span. The box girders are fabricated full size on land, were floated out, and jacked up to final position 197 ft (60 m) above sea level. A pair of completed boxes 566 ft (172.6 m) were used as a pontoon to transport the side spans. The pontoon was subsequently jacked out of the water to form the central part of the main span. Some problems were encountered in controlling weld toughness and joint distortion.

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10015602
  • Veröffentlicht am:
    25.07.2004
  • Geändert am:
    14.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine