0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Research and implementation of tunnel construction schedule management system based on Unity3D

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Materials Science and Engineering, , n. 3, v. 768
Seite(n): 032002
DOI: 10.1088/1757-899x/768/3/032002
Abstrakt:

In view of the slow progress of tunnel engineering construction in China due to the influence of terrain geology and climate, a tunnel construction progress management system based on virtual reality simulation technology is developed. The article uses Revit for high-quality model, Unity3D is a three-dimensional virtual reality engine to develop a construction progress management system for construction progress recording and early warning. The results show that the tunnel construction progress management system developed based on Unity3D can alleviate the lag of construction progress, achieve safe and controllable construction site.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1757-899x/768/3/032002.
  • Über diese
    Datenseite
  • Reference-ID
    10675240
  • Veröffentlicht am:
    02.06.2022
  • Geändert am:
    02.06.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine