0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Rebuilding the Taggenbrunn Railway Bridge, Austria

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 1, v. 7
Seite(n): 14-16
DOI: 10.2749/101686697780495337
Abstrakt:

The Taggenbrunn Bridge is in fact two bridges of the same shape, the first erected in 1905, the second in 1911. To upgrade the bridge, it was decided to reinforce the foundations and the arched approach spans, and to totally replace the steel structure with a new one. As is now usual in Austria, this work could begin only after completing a range of environmental studies. The owner investigated several solutions in order to fulfill both the operational and environmental demands. It was decided to retain the basic look, layout and construction of piers, abutments and the masonry approach spans and to totally replace the steel construction of the bridge itself.

  • Über diese
    Datenseite
  • Reference-ID
    10003684
  • Veröffentlicht am:
    20.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine