Autor(en): |
Conrad W. Felice
Henry Brenniman |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Civil Engineering Magazine, Mai 2005, n. 5, v. 75 |
Seite(n): | 64-71 |
DOI: | 10.1061/ciegag.0000018 |
Abstrakt: |
The foundations for a 500 m long cable-stayed bridge and its approaches in India included 676 large-diameter shafts drilled to lengths that varied from 4 to 34 m in geotechnical conditions that varied from highly weathered volcanic material to massive, high-strength rocks. The key to success was a program of pier-by-pier design and careful in situ testing. |
Bauwerke und Projekte
- Über diese
Datenseite - Reference-ID
10020253 - Veröffentlicht am:
23.07.2005 - Geändert am:
01.12.2018