Nps Composite Beams and Columns Used for the Odense University Hospital

Autor(en): (Tecnostrutture S.r.l.)
(Odense Hospital Project Team Joint Venture I/S)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: ce/papers, , n. 1, v. 6
Seite(n): 554-565
DOI: 10.1002/cepa.1936
Abstrakt:

This document presents the case study of the Odense University Hospital, built with the NPS steel‐concrete composite frame. This is one of the most challenging projects currently in Europe: 250,000 square meters to be built in just over three years. The client has taken up the challenge of respecting timeframe and budget by focusing on offsite construction and digitalization of processes. Time constrains, safety and sustainability are the three main drivers of the project. Among these, the strict delivery time represents the main critical aspect. The expected turnkey delivery in 2022 assumed the choice of an extremely simple and fast construction method. Further advantages of using steel‐concrete composite structures with reference to the Odense University Hospital Case are explained.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/cepa.1936.
  • Über diese
    Datenseite
  • Reference-ID
    10767453
  • Veröffentlicht am:
    17.04.2024
  • Geändert am:
    17.04.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine