0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

New Bridges for a Brown Coal Bunker, Cologne, Germany

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 4, v. 1
Seite(n): 22-23
DOI: 10.2749/101686691780617256
Abstrakt:

In the plant Ville Berrenrath Bunker Gotteshülfe about 30,000 tons of brown coal are transshipped in one day. The coal is transported on railway wagons directly from the open-cast to the bunker. Inside the hall the wagons stop at one of the 2 bridges running over the bunkers with a total length of 144 m. The wagons are opened so that the coal runs through the open-bridge deck in the bunker underneath the bridge. From there dredging machines put the coal on band-conveyors which carry the coal directly to its final destination. In this paper, the existing and new structures are briefly described.

  • Über diese
    Datenseite
  • Reference-ID
    10003389
  • Veröffentlicht am:
    18.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine