0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 3, v. 7
Seite(n): 178-181
DOI: 10.2749/101686697780494761
Abstrakt:

The Bukit Panjang Light Rapid Transit (LRT) system is a design-and-build project under construction in Singapore. The LRT system has been designed to blend in with the residential areas located in the northwest part of Singapore and to serve as a feeder to the existing heavy rail network. A prime objective has been to ensure that station access for every passenger in the catchment areas does not exceed 500 m walking distance. The main civil engineering elements of the project consist of 8 km of twin-track elevated concrete guideway, 13 stations and a maintenance depot. Precast prestressed concrete segmental box girders with glued joints and internally prestressed tendons have been adopted as the main structural form for the guideway superstructure.

Geografische Orte

  • Über diese
    Datenseite
  • Reference-ID
    10003723
  • Veröffentlicht am:
    20.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine