0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Gibraltar Strait Crossing - An Alternative: a Submerged Bridge-Tunnel

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 2, v. 2
Seite(n): 140-142
DOI: 10.2749/101686692780615888
Abstrakt:

For the Gibraltar Strait Crossing, two classical solutions have been under close scrutiny: Excavated Tunnel (54 km long) and Suspension Bridge (30 km long, with many 2,000 m spans). Another, third solution - Suspension Bridge (14 km long with two main 5,000 m spans) - has been also examined. In this article, another solution is proposed - a Submerged Bridge-Tunnel (on the shortest route - 14 km). Its advantages - design and construction time, cost, etc. - are due mainly to 1) eliminating the gravity loads by the hydrostatic buoyancy forces, 2) absence of wind and temperature influences, and 3) absence, entirely or partially, of many preliminary, expensive, and time-consuming studies and investigations.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10003422
  • Veröffentlicht am:
    18.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine