0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

General Design for Bridges along High-Speed Railway Lines

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 2, v. 2
Seite(n): 84-87
DOI: 10.2749/101686692780616003
Abstrakt:

Due to the location parameters for high-speed railway lines and the topographic conditions, the share of bridge structures in the new construction sections of the German Federal Railways (DB) is very high. A decision was therefore made at an earlier stage before starting construction works, already for the working out of a general design concept for the numerous engineering structures to be established. General Design has stood the test in practice with the new construction sections of the German Federal Railways. New findings, gained in practice, were either transformed right away or integrated into the standard drawings for future structures.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10003409
  • Veröffentlicht am:
    18.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine