0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Fire and Blast Protection for Multi-Strand Stay Cables of Rod El Farag Axis Bridge

Autor(en): (Liuzhou OVM Machinary Co., Ltd., Liuzhou, People’s Republic of China)
(Liuzhou OVM Machinary Co., Ltd., Liuzhou, People’s Republic of China)
ORCID (Department of Bridge Engineering, Tongji University, Shanghai, People’s Republic of China)
(Liuzhou OVM Machinary Co., Ltd., Liuzhou, People’s Republic of China)
(Department of Bridge Engineering, Tongji University, Shanghai, People’s Republic of China)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 1, v. 33
Seite(n): 1-4
DOI: 10.1080/10168664.2021.2024783
Abstrakt: Long span cable-stayed bridges face risks of fire and explosion accidents caused by vehicles transporting fuel or chemicals. Such accidents may lead to damage to the stay cables, which in turn reduces the load capability of the bridge. This report introduces a newly developed fire and blast protection system for the multi-strand stay cables of Rod El Farag Axis Bridge in Egypt. The protection system consists of a thermal insulation blanket wrapped on cables and a steel tube covered with an anti-blast layer. Fire and blast tests were carried out to verify the effectiveness of the developed protection system.

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1080/10168664.2021.2024783.
  • Über diese
    Datenseite
  • Reference-ID
    10662547
  • Veröffentlicht am:
    09.05.2022
  • Geändert am:
    08.06.2023
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine