Erection of Cable-Stayed Bridges Having Composite Decks with Precast Concrete Slabs

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Bridge Engineering (ASCE), , n. 5, v. 6
Seite(n): 333-339
DOI: 10.1061/(asce)1084-0702(2001)6:5(333)
Abstrakt:

For the construction of composite steel-concrete decks of cable-stayed bridges, methods of erection and analysis have to be applied that, upon completion of the deck, accurately yield the prescribed dead load configuration of the deck regarding geometry and forces. During deck erection, no unwanted bending moments should be locked into the composite sections when the concrete slab is connected to the steel substructure. Such locked-in moments would bend the deck, cause concrete creep that is difficult to predict, and introduce the risk of deviations from the desired deck alignment and the corresponding distribution of forces. This paper presents a simple and practical method of erection and erection analysis for composite decks with precast concrete slabs. A two-step tensioning procedure of the stay cables is proposed that minimizes the effects of unwanted locked-in moments, making it easy to predict the geometry of the erection stages and to yield the desired dead load configuration of the deck. The method was successfully applied for the erection of the Ting Kau Bridge in Hong Kong, a cable-stayed bridge of 1,200 m in length having a composite deck with a precast deck slab.

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)1084-0702(2001)6:5(333).
  • Über diese
    Datenseite
  • Reference-ID
    10013960
  • Veröffentlicht am:
    12.01.2004
  • Geändert am:
    08.10.2018
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine