0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

A dominant factor of human resources performance of construction management in supervising high rise building construction phase

Autor(en):





Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Materials Science and Engineering, , n. 2, v. 1098
Seite(n): 022038
DOI: 10.1088/1757-899x/1098/2/022038
Abstrakt:

The percentage of human resources (HR) in construction that has a certificate of skilled labour is moderately low, which is less than 6% of the total human resources in the construction sector in Indonesia. The certificate can describe the ability, expertise, and competence of the certificate owner. Human resources’’ quality have an influence on project productivity so that project success can be achieved. Construction Management has an important role as an HR manager who will work on the project including HR who works as a supervisor of construction activities on the project. The purpose of this study is to determine the dominant factors affecting the performance quality of the Management Construction HR on supervising high rise building construction. This study uses quantitative methods with factor analysis. Collected data are primary data from Management Construction HR which collected from questionnaire. The results from this study are five factors that affect the quality of HR performance. Based on the five factors, the most important factor is technical skills factor.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1757-899x/1098/2/022038.
  • Über diese
    Datenseite
  • Reference-ID
    10674746
  • Veröffentlicht am:
    03.06.2022
  • Geändert am:
    03.06.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine