Deviation rectification of a high-rise building with piled raft foundation: a case study
Autor(en): |
Junhua Xiao
(School of Civil Engineering, Shandong Jianzhu University, Jinan, China)
Daotong Guo (Shandong Jiangu Special Engineering Co., Ltd., Jinan, China) Qingpeng Wang (Shandong Jianzhu University Engineering Appraisal and Strengthening Design Co., Ltd., Jinan, China) Xiang Gao (School of Civil Engineering, Shandong Jianzhu University, Jinan, China) Jianping Sun (School of Civil Engineering, Shandong Jianzhu University, Jinan, China) |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Proceedings of the Institution of Civil Engineers - Forensic Engineering, Januar 2023, n. 1, v. 176 |
Seite(n): | 1-10 |
DOI: | 10.1680/jfoen.21.00036 |
- Über diese
Datenseite - Reference-ID
10679260 - Veröffentlicht am:
18.06.2022 - Geändert am:
20.02.2023