Building information modelling for facility management: are we there yet?

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 6, v. 24
Seite(n): 1119-1154
DOI: 10.1108/ecam-06-2016-0139
Abstrakt:

Purpose

Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended to support the entire project life-cycle: the design and construction phases, and also facility management (FM). However, BIM-enabled FM remains in its infancy and has not yet reached its full potential. The purpose of this paper is to identify major aspects of BIM in order to derive a fully BIM-enabled FM process.

Design/methodology/approach

In total, 207 papers were classified into main and subordinate research areas for quantitative analysis. These findings were then used to conceptualise a BIM-enabled FM framework grounded by innovation diffusion theory for adoption, and for determining the path of future research.

Findings

Through an extensive literature review, the paper summarises many benefits and challenges. Major aspects of BIM are identified in order to describe a BIM-enabled FM implementation process grounded by innovation diffusion theory. The major research areas of the proposed framework include: planning and guidelines; value realisation; internal leadership and knowledge; procurement; FM; specific application areas; data capture techniques; data integration; knowledge management; and legal and policy impact. Each element is detailed and is supported by literature. Finally, gaps are highlighted for investigation in future research.

Originality/value

This paper systematically classifies and evaluates the existing research, thus contributing to the achievement of the ultimate vision of BIM-enabled FM. The proposed framework informs facility managers, and the BIM-enabled FM implementation process. Further, the holistic survey identifies gaps in the body of knowledge, revealing avenues for future research.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-06-2016-0139.
  • Über diese
    Datenseite
  • Reference-ID
    10576588
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine