0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Administering Extension of Time under National and International Standard Forms of Contracts: A Contractor’s Perspective

Autor(en): (Associate Professor and Construction Engineering and Management Program Coordinator, Dept. of Civil and Environmental Engineering, Univ. of Tennessee—Knoxville, 851 Neyland Dr., 417 John D. Tickle Bldg., Knoxville, TN 37996 (corresponding author).)
(FCIArb, Senior Contracts Manager, Dar Al Mimar Group; Instructor, Engineering and Sciences Services, American Univ. in Cairo, 1 Abu Bakr El Seddik St., Dokki, Giza, Egypt.)
(Graduate Student, Dept. of Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., Walker Engineering Bldg., Mississippi State, MS 39762.)
(Undergraduate Student, Dept. of Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., Walker Engineering Bldg., Mississippi State, MS 39762.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 8
Seite(n): 04516001
DOI: 10.1061/(asce)la.1943-4170.0000182
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)la.1943-4170.0000182.
  • Über diese
    Datenseite
  • Reference-ID
    10579807
  • Veröffentlicht am:
    08.03.2021
  • Geändert am:
    08.03.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine