-
Wuni, Ibrahim Yahaya / Abankwa, Derek Asante / Koc, Kerim / Atuahene, Bernard Tuffour / Saka, Abdullahi: A comprehensive analysis of the benefits of integrated digital delivery in construction projects. In: Smart and Sustainable Built Environment.
https://doi.org/10.1108/sasbe-04-2024-0147
-
Jan, Bushra / Asif, Muhammad / Wuni, Ibrahim Yahaya (2024): Energy use behavior research: A scientometric evaluation and critical synthesis. In: Energy and Buildings, v. 325 (Dezember 2024).
https://doi.org/10.1016/j.enbuild.2024.115033
-
Li, Yanxue / Antwi-Afari, Maxwell Fordjour / Anwer, Shahnawaz / Mehmood, Imran / Umer, Waleed / Mohandes, Saeed Reza / Wuni, Ibrahim Yahaya / Abdul-Rahman, Mohammed / Li, Heng (2024): Artificial Intelligence in Net-Zero Carbon Emissions for Sustainable Building Projects: A Systematic Literature and Science Mapping Review. In: Buildings, v. 14, n. 9 (25 August 2024).
https://doi.org/10.3390/buildings14092752
-
Buniya, Mohanad Kamil / Wuni, Ibrahim Yahaya / Yousif, Omar Sedeeq / Al-Mhdawi, M. K. S.: Quantifying the impact index of key barriers to safety program initiatives in the Iraqi construction industry. In: Construction Innovation.
https://doi.org/10.1108/ci-08-2023-0185
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping (2022): Exploring the critical success determinants for supply chain management in modular integrated construction projects. In: Smart and Sustainable Built Environment, v. 12, n. 2 (Januar 2022).
https://doi.org/10.1108/sasbe-03-2021-0051
-
Wuni, Ibrahim Yahaya: Developing a multidimensional risk assessment model for sustainable construction projects. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-11-2023-1201
-
Wuni, Ibrahim Yahaya / Abankwa, Derek Asante / Koc, Kerim / Adukpo, Selorm Emmanuel / Antwi-Afari, Maxwell Fordjour (2024): Critical barriers to the adoption of integrated digital delivery in the construction industry. In: Journal of Building Engineering, v. 83 (April 2024).
https://doi.org/10.1016/j.jobe.2024.108474
-
Wuni, Ibrahim Yahaya / Abankwa, Derek Asante: Understanding the key risks in circular construction projects: from systematic review to conceptual framework. In: Construction Innovation.
https://doi.org/10.1108/ci-04-2023-0068
-
Wuni, Ibrahim Yahaya (2023): Drivers of circular economy adoption in the construction industry: a systematic review and conceptual model. In: Building Research & Information, v. 51, n. 7 (Mai 2023).
https://doi.org/10.1080/09613218.2023.2211689
-
Wuni, Ibrahim Yahaya / Mazher, Khwaja Mateen (2023): Ending the suitability quantification dilemma: intelligent decision support system for modular integrated construction in a high-density metropolis. In: Construction Innovation, v. 24, n. 4 (August 2023).
https://doi.org/10.1108/ci-09-2022-0242
-
Wuni, Ibrahim Yahaya / Bao, Zhikang / Yevu, Sitsofe Kwame / Tetteh, Mershack Opoku (2023): Theorizing the path dependencies and hierarchical structure of the multidimensional risks in green building projects. In: Journal of Building Engineering, v. 68 (Juni 2023).
https://doi.org/10.1016/j.jobe.2023.106069
-
Yevu, Sitsofe Kwame / Owusu, Emmanuel Kingsford / Chan, Albert P. C. / Oti-Sarpong, Kwadwo / Wuni, Ibrahim Yahaya / Tetteh, Mershack Opoku (2021): Systematic review on the integration of building information modelling and prefabrication construction for low-carbon building delivery. In: Building Research & Information, v. 51, n. 3 (August 2021).
https://doi.org/10.1080/09613218.2022.2131504
-
Wuni, Ibrahim Yahaya (2022): Mapping the barriers to circular economy adoption in the construction industry: A systematic review, Pareto analysis, and mitigation strategy map. In: Building and Environment, v. 223 (September 2022).
https://doi.org/10.1016/j.buildenv.2022.109453
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping / Saka, Abdullahi B. (2022): Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. In: Engineering, Construction and Architectural Management, v. 30, n. 5 (Februar 2022).
https://doi.org/10.1108/ecam-07-2021-0630
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping / Antwi-Afari, Maxwell Fordjour (2021): Exploring the design risk factors for modular integrated construction projects. In: Construction Innovation, v. 23, n. 1 (September 2021).
https://doi.org/10.1108/ci-02-2021-0025
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping / Ogungbile, Adedayo Johnson / Ayitey, Jonathan Zinzi (2021): Four-pronged decision support framework for implementing industrialized construction projects. In: Construction Innovation, v. 22, n. 2 (Oktober 2021).
https://doi.org/10.1108/ci-11-2020-0184
-
Wuni, Ibrahim Yahaya / Wu, Zezhou / Shen, Geoffrey Qiping / Bugri, John Tiah / Frimpong-Asante, James (2021): Benefit Evaluation of Design for Excellence in Industrialized Construction Projects. In: Journal of Architectural Engineering (ASCE), v. 27, n. 4 (Dezember 2021).
https://doi.org/10.1061/(asce)ae.1943-5568.0000505
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping / Darko, Amos (2021): Best practices for implementing industrialized construction projects: lessons from nine case studies. In: Construction Innovation, v. 22, n. 4 (Oktober 2021).
https://doi.org/10.1108/ci-04-2021-0070
-
Wuni, Ibrahim Yahaya / Wu, Zezhou / Shen, Geoffrey Qiping (2021): Exploring the challenges of implementing design for excellence in industrialized construction projects in China. In: Building Research & Information, v. 51, n. 3 (August 2021).
https://doi.org/10.1080/09613218.2021.1961574
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping (2020): Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. In: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020).
https://doi.org/10.1108/ecam-10-2019-0534
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping (2020): Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas. In: Built Environment Project and Asset Management, v. 10, n. 3 (März 2020).
https://doi.org/10.1108/bepam-02-2020-0025
-
Wuni, Ibrahim Yahaya / Shen, Geoffrey Qiping (2019): Critical success factors for modular integrated construction projects: a review. In: Building Research & Information, v. 48, n. 7 (September 2019).
https://doi.org/10.1080/09613218.2019.1669009