H. Randolph Thomas
- Teaching Construction Contracts. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 4 (November 2009). (2009):
- Why Are Loss of Labor Efficiency Damages So Difficult to Recover?. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 4 (November 2010). (2010):
- Some Principles Applied to DSC Claims. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 4, n. 2 (Mai 2012). (2012):
- What to Do When Faced with Defective Contract Documents Can Be a Costly Decision. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 4, n. 4 (November 2012). (2012):
- Role of Workforce Management in Bridge Superstructure Labor Productivity. In: Journal of Management in Engineering (ASCE), v. 19, n. 1 (Januar 2003). (2003):
- Schedule Acceleration, Work Flow, and Labor Productivity. In: Journal of Construction Engineering and Management, v. 126, n. 4 (Juli 2000). (2000):
- Role of the Fabricator in Labor Productivity. In: Journal of Construction Engineering and Management, v. 126, n. 5 (Oktober 2000). (2000):
- Settlement of Construction Jurisdictional Disputes. In: Journal of Construction Engineering and Management, v. 110, n. 2 (März 1984). (1984):
- Understanding Defective Specifications. In: Journal of Construction Engineering and Management, v. 121, n. 1 (März 1995). (1995):
- Scheduled Overtime and Labor Productivity: Quantitative Analysis. In: Journal of Construction Engineering and Management, v. 123, n. 2 (Juni 1997). (1997):
- Validation of Vibration-Based Onboard Asphalt Density Measuring System. In: Journal of Construction Engineering and Management, v. 129, n. 1 (Februar 2003). (2003):
- Symbiotic Crew Relationships and Labor Flow. In: Journal of Construction Engineering and Management, v. 130, n. 6 (Dezember 2004). (2004):