Tam, Vivian W. Y. / Tam, C. M. / Zeng, S. X. / Ng, William C. Y. (2007): Towards adoption of prefabrication in construction. In: Building and Environment, v. 42, n. 10 (Oktober 2007).
https://doi.org/10.1016/j.buildenv.2006.10.003
-
Tam, Vivian W. Y. / Shen, L. Y. / Yau, Rico M. Y. / Tam, C. M. (2007): On using a communication-mapping model for environmental management (CMEM) to improve environmental performance in project development processes. In: Building and Environment, v. 42, n. 8 (August 2007).
https://doi.org/10.1016/j.buildenv.2006.10.035
-
Gao, X. F. / Tam, C. M. / Gao, W. Z. (2002): Polymer cement plaster to prevent radon gas contamination within concrete building structures. In: Building and Environment, v. 37, n. 4 (April 2002).
https://doi.org/10.1016/s0360-1323(01)00043-9
-
Cheung, S. O. / Tam, C. M. / Harris, F. C. (2000): Project Dispute Resolution Satisfaction Classification through Neural Network. In: Journal of Management in Engineering (ASCE), v. 16, n. 1 (Januar 2000).
https://doi.org/10.1061/(asce)0742-597x(2000)16:1(70)
-
Zeng, S. X. / Tam, C. M. / Wang, H. C. / Deng, Z. M. (2003): Overcoming Problems Associated with Sustainable Development of the Construction Industry in China. In: Architectural Science Review, v. 46, n. 4 (Dezember 2003).
https://doi.org/10.1080/00038628.2003.9697006
-
Zeng, S. X. / Tam, C. M. / Wang, H. C. / Deng, Z. M. (2002): Quality Certification Scheme in the Construction Industry of China. In: Architectural Science Review, v. 45, n. 2 (Juni 2002).
https://doi.org/10.1080/00038628.2002.9697496
-
Zeng, S. X. / Tam, C. M. / Deng, Z. M. / Wang, H. C. (2003): The Rise and Fall of Total Quality Management in the Chinese Construction Industry. In: Architectural Science Review, v. 46, n. 2 (Juni 2003).
https://doi.org/10.1080/00038628.2003.9696972
-
Zhang, Hong / Li, Heng / Tam, C. M. (2006): Permutation-Based Particle Swarm Optimization for Resource-Constrained Project Scheduling. In: Journal of Computing in Civil Engineering, v. 20, n. 2 (März 2006).
https://doi.org/10.1061/(asce)0887-3801(2006)20:2(141)
-
Tam, C. M. / Leung, Arthur W. T. / Liu, D. K. (2002): Nonlinear Models for Predicting Hoisting Times of Tower Cranes. In: Journal of Computing in Civil Engineering, v. 16, n. 1 (Januar 2002).
https://doi.org/10.1061/(asce)0887-3801(2002)16:1(76)
-
Tam, Vivian W. Y. / Tam, C. M. / Wang, Y. (2007): Optimization on proportion for recycled aggregate in concrete using two-stage mixing approach. In: Construction and Building Materials, v. 21, n. 10 (Oktober 2007).
https://doi.org/10.1016/j.conbuildmat.2006.05.040
-
Tam, Vivian W. Y. / Gao, X. F. / Tam, C. M. / Chan, C. H. (2008): New approach in measuring water absorption of recycled aggregates. In: Construction and Building Materials, v. 22, n. 3 (März 2008).
https://doi.org/10.1016/j.conbuildmat.2006.08.009
-
Tam, C. M. / Tong, Thomas K. L. / Leung, Arthur W. T. / Chiu, Gerald W. C. (2002): Site Layout Planning using Nonstructural Fuzzy Decision Support System. In: Journal of Construction Engineering and Management, v. 128, n. 3 (Juni 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:3(220)
-
Sing, Chun-Pong / Love, P. E. D. / Tam, C. M. (2012): Stock-Flow Model for Forecasting Labor Supply. In: Journal of Construction Engineering and Management, v. 138, n. 6 (Juni 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000485
-
Huang, C. / Wong, C. K. / Tam, C. M. (2011): Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming. In: Automation in Construction, v. 20, n. 5 (August 2011).
https://doi.org/10.1016/j.autcon.2010.11.023
-
Huang, C. / Wong, C. K. / Tam, C. M. (2010): Optimization of material hoisting operations and storage locations in multi-storey building construction by mixed-integer programming. In: Automation in Construction, v. 19, n. 5 (August 2010).
https://doi.org/10.1016/j.autcon.2010.02.005
-
Tam, V. W. Y. / Tam, C. M. (2007): A new approach in assessing cement mortar remains on recycled aggregate. In: Magazine of Concrete Research, v. 59, n. 6 (August 2007).
https://doi.org/10.1680/macr.2007.59.6.413
-
Hong, Zhang / Shi, Jonathan J. / Tam, C. M. (2002): Visual modeling and simulation for construction operations. In: Automation in Construction, v. 11, n. 1 (Januar 2002).
https://doi.org/10.1016/s0926-5805(01)00049-8
-
Sing, Chun-Pong / Love, Peter E. D. / Tam, C. M. (2012): Multiplier Model for Forecasting Manpower Demand. In: Journal of Construction Engineering and Management, v. 138, n. 10 (Oktober 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000529
-
Tam, C. M. / Tong, Thomas K. L. / Wong, Y. W. (2004): Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. In: Journal of Construction Engineering and Management, v. 130, n. 6 (Dezember 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:6(827)
-
Zhang, Hong / Li, Heng / Tam, C. M. (2006): Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. In: Journal of Construction Engineering and Management, v. 132, n. 3 (März 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:3(259)
-
Zhang, Hong / Tam, C. M. / Li, Heng / Shi, Jonathan Jingsheng (2006): Particle Swarm Optimization-Supported Simulation for Construction Operations. In: Journal of Construction Engineering and Management, v. 132, n. 12 (Dezember 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1267)
-
Tam, C. M. / Deng, Z. M. / Zeng, S. X. / Ho, C. S. (2000): Quest for continuous quality improvement for public housing construction in Hong Kong. In: Construction Management and Economics, v. 18, n. 4 (Juni 2000).
https://doi.org/10.1080/01446190050024851
-
Ng, K. M. / Tam, C. M. / Tam, V. W. Y. (2010): Studying the production process and mechanical properties of reactive powder concrete: a Hong Kong study. In: Magazine of Concrete Research, v. 62, n. 9 (September 2010).
https://doi.org/10.1680/macr.9.00063
-
Tam, C. M. / Tam, V. W. Y. / Ng, K. M. (2010): Optimal conditions for producing reactive powder concrete. In: Magazine of Concrete Research, v. 62, n. 10 (Oktober 2010).
https://doi.org/10.1680/macr.2010.62.10.701
-
Tam, C. M. / Fung, Ivan W. H. / Yeung, Thomas C. L. / Tung, Karen C. F. (2003): Relationship between construction safety signs and symbols recognition and characteristics of construction personnel. In: Construction Management and Economics, v. 21, n. 7 (Oktober 2003).
https://doi.org/10.1080/0144619032000056171
-
Hong, Zhang / Tam, C. M. / Shi, Jonathan J. (2001): Resource allocation heuristic in construction simulation. In: Construction Management and Economics, v. 19, n. 6 (Oktober 2001).
https://doi.org/10.1080/01446190110063473
-
Zhang, H. / Tam, C. M. / Shi, Jonathan J. (2002): Simulation-based methodology for project scheduling. In: Construction Management and Economics, v. 20, n. 8 (November 2002).
https://doi.org/10.1080/0144619022000014088
-
Tam, C. M. / Fung, Ivan W. H. / Chan, Albert P. C. (2001): Study of attitude changes in people after the implementation of a new safety management system: the supervision plan. In: Construction Management and Economics, v. 19, n. 4 (Juli 2001).
https://doi.org/10.1080/01446190010027591
-
Tam, C. M. / Tong, Thomas K. L. / Lau, Tony C. T. / Chan, K. K. (2005): Selection of vertical formwork system by probabilistic neural networks models. In: Construction Management and Economics, v. 23, n. 3 (März 2005).
https://doi.org/10.1080/0144619042000205912
-
Leung, Arthur W. T. / Tam, C. M. (1999): Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. In: Construction Management and Economics, v. 17, n. 3 (Mai 1999).
https://doi.org/10.1080/014461999371510