C. M. Tam
- Microstructural analysis of recycled aggregate concrete produced from two-stage mixing approach. In: Cement and Concrete Research, v. 35, n. 6 (Juni 2005). (2005):
- Feng Shui and Its Impacts on Land and Property Developments. In: Journal of Urban Planning and Development, v. 125, n. 4 (Dezember 1999). (1999):
- Modelling loan acquisition decisions. In: Engineering, Construction and Architectural Management, v. 5, n. 4 (April 1998). (1998):
- Fuzzy optimisation of labour allocation by genetic algorithms. In: Engineering, Construction and Architectural Management, v. 10, n. 2 (April 2003). (2003):
- Fuzzy discrete‐event simulation for modeling uncertain activity duration. In: Engineering, Construction and Architectural Management, v. 11, n. 6 (Dezember 2004). (2004):
- Investigating the intentional quality risks in public foundation projects: A Hong Kong study. In: Building and Environment, v. 42, n. 1 (Januar 2007). (2007):
- Evaluations of existing waste recycling methods: A Hong Kong study. In: Building and Environment, v. 41, n. 12 (Dezember 2006). (2006):
- Evaluation of construction methods and performance for high rise public housing construction in Hong Kong. In: Building and Environment, v. 37, n. 10 (Oktober 2002). (2002):
- Investigation of micro-cracks and microstructure of high performance lightweight aggregate concrete. In: Building and Environment, v. 37, n. 5 (Mai 2002). (2002):
- ISO 14000 and the Construction Industry: Survey in China. In: Journal of Management in Engineering (ASCE), v. 19, n. 3 (Juli 2003). (2003):
- Multi-level optimal design of buildings with active control under winds using genetic algorithms. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 86, n. 1 (Mai 2000). (2000):
- Market Structure of the Construction Industry of China. In: Architectural Science Review, v. 48, n. 4 (Dezember 2005). (2005):
- Evaluation of Implementing ISO 9001:2000 Standard in the Construction Industry of China. In: Architectural Science Review, v. 48, n. 1 (März 2005). (2005):
- Implementation of Environmental Management in the Construction Industry of China. In: Architectural Science Review, v. 47, n. 1 (März 2004). (2004):
- Multiple GMDH models for estimating resource requirements. In: Construction Innovation, v. 5, n. 2 (Juni 2005). (2005):
- Iconic Animation for Activity-based Construction Simulation. In: Journal of Computing in Civil Engineering, v. 16, n. 3 (Juli 2002). (2002):
- Genetic Algorithm for Optimizing Supply Locations around Tower Crane. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001). (2001):
- Models for Assessing Hoisting Times of Tower Cranes. In: Journal of Construction Engineering and Management, v. 125, n. 6 (Dezember 1999). (1999):
- Mapping Approach for Examining Waste Management on Construction Sites. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004). (2004):
- Multimode Project Scheduling Based on Particle Swarm Optimization. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 2 (Februar 2006). (2006):
- Multi-level design model and genetic algorithm for structural control system optimization. In: Earthquake Engineering and Structural Dynamics, v. 30, n. 6 (Juni 2001). (2001):
- Factors affecting clients' project dispute resolution satisfaction in Hong Kong. In: Construction Management and Economics, v. 18, n. 3 (April 2000). (2000):
- Fuzzy decision-making for dynamic resource allocation. In: Construction Management and Economics, v. 21, n. 1 (Januar 2003). (2003):
- Genetic algorithm optimization in building portfolio management. In: Construction Management and Economics, v. 19, n. 6 (Oktober 2001). (2001):
- Monitoring financial health of contractors at the aftermath of the Asian economic turmoil: a case study in Hong Kong. In: Construction Management and Economics, v. 23, n. 5 (Juni 2005). (2005):
- Heuristic scheduling of resource‐constrained, multiple‐mode and repetitive projects. In: Construction Management and Economics, v. 24, n. 2 (Februar 2006). (2006):
- GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. In: Construction Management and Economics, v. 21, n. 3 (April 2003). (2003):
- Genetic algorithm model in optimizing the use of labour. In: Construction Management and Economics, v. 19, n. 2 (März 2001). (2001):
- Modelling hook times of mobile cranes using artificial neural networks. In: Construction Management and Economics, v. 22, n. 8 (Oktober 2004). (2004):
-
Modelling of structural response and optimization of structural control system using neural network and genetic algorithm. In: The Structural Design of Tall Buildings, v. 9, n. 4 ( 2000).
https://doi.org/10.1002/1099-1794(200009)9:4<279::aid-tal152>3.0.co;2-2
(2000):