-
Bayesteh, Ali / Lu, Ming / Lakshminarasimhan, Prasanna (2024): Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach. In: Journal of Civil Engineering and Management, v. 30, n. 8 (17 September 2024).
https://doi.org/10.3846/jcem.2024.21744
-
Hasan, Monjurul / Lu, Ming (2024): Mitigating Project Schedule Risks by Identifying Subcritical Paths and Variance-Critical Activities. In: Journal of Construction Engineering and Management, v. 150, n. 8 (August 2024).
https://doi.org/10.1061/jcemd4.coeng-14821
-
Wang, Sida / Hasan, Monjurul / Lu, Ming (2024): Global Sensitivity Analysis Methodology for Construction Simulation Models: Multiple Linear Regressions versus Multilayer Perceptions. In: Journal of Construction Engineering and Management, v. 150, n. 5 (Mai 2024).
https://doi.org/10.1061/jcemd4.coeng-14059
-
Lu, Ming / Liang, Fan / Xing, Jun (2024): Navigating urban shrinkage: Spatial influencing factors and strategic priorities for urban spatial performance in Heilongjiang Province, China. In: Sustainable Cities and Society, v. 101 (Februar 2024).
https://doi.org/10.1016/j.scs.2024.105200
-
Lu, Ming / Diao, Qiu-Feng / Zheng, Yuan-Yuan / Yin, Zhen-Yu / Dai, Zheng (2024): Influence of Water on Tensile Behavior of Illite through the Molecular Dynamics Method. In: International Journal of Geomechanics, v. 24, n. 4 (April 2024).
https://doi.org/10.1061/ijgnai.gmeng-8999
-
Zhang, Xiao / Yu, Li / Wang, Mingnian / Yang, Henghong / Lu, Ming / Li, Zexing / Tang, Langzhou (2024): Investigation of the failure mechanism and theoretical model of bolt-reinforced shallow tunnel faces with different bolt lengths. In: Underground Space, v. 16 (Juni 2024).
https://doi.org/10.1016/j.undsp.2023.10.002
-
Hasan, Monjurul / Lu, Ming / Newton, Ross (2023): Multi-contractor multi-project matching optimization for planning modular school construction programs. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 2 (Februar 2023).
https://doi.org/10.1139/cjce-2022-0299
-
Tang, Langzhou / Yu, Li / Wang, Mingnian / Li, Zexing / Zhang, Xiao / Lu, Ming / Yang, Henghong (2022): Green's functions based on the Timoshenko beam model for the longitudinal seismic dynamic response of tunnels crossing soft and hard rock strata. In: Tunnelling and Underground Space Technology, v. 128 (Oktober 2022).
https://doi.org/10.1016/j.tust.2022.104545
-
Dai, Fei / Dong, Suyang / Kamat, Vineet R. / Lu, Ming (2011): Photogrammetry Assisted Measurement of Interstory Drift for Rapid Post-disaster Building Damage Reconnaissance. In: Journal of Nondestructive Evaluation, v. 30, n. 3 (30 Juni 2011).
https://doi.org/10.1007/s10921-011-0108-6
-
Zahedi, Leila / Lu, Ming (2022): Generating Labour Cost Budget for a Construction-Oriented Fabrication Facility: Simulation-based Resource Scheduling Approach. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 6 (Juni 2022).
https://doi.org/10.1139/cjce-2020-0429
-
Mohsenijam, Arash / Lu, Ming / Naumets, Serhii (2022): Integrating Model Tree and Modified Stepwise Regression in Concrete Slump Prediction and Steel Fabrication Estimating. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 4 (April 2022).
https://doi.org/10.1139/cjce-2020-0753
-
Naumets, Serhii / Lu, Ming (2021): Investigation into Explainable Regression Trees for Construction Engineering Applications. In: Journal of Construction Engineering and Management, v. 147, n. 8 (August 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002083
-
Mohsenijam, Arash / Lu, Ming (2019): Framework For Developing Labour-hour Prediction Models From Project Design Features: Case Study In Structural Steel Fabrication. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 10 (Oktober 2019).
https://doi.org/10.1139/cjce-2018-0349
-
Yi, Chaojue / Lu, Ming (2019): Mixed-Integer Linear Programming–Based Sensitivity Analysis in Optimization of Temporary Haul Road Layout Design for Earthmoving Operations. In: Journal of Computing in Civil Engineering, v. 33, n. 3 (Mai 2019).
https://doi.org/10.1061/(asce)cp.1943-5487.0000838
-
Zheng, Chaoyu / Yi, Chaojue / Lu, Ming (2019): Integrated optimization of rebar detailing design and installation planning for waste reduction and productivity improvement. In: Automation in Construction, v. 101 (Mai 2019).
https://doi.org/10.1016/j.autcon.2019.01.012
-
Mohsenijam, Arash / Siu, Ming-Fung Francis / Lu, Ming (2017): Modified Stepwise Regression Approach to Streamlining Predictive Analytics for Construction Engineering Applications. In: Journal of Computing in Civil Engineering, v. 31, n. 3 (Mai 2017).
https://doi.org/10.1061/(asce)cp.1943-5487.0000636
-
Lu, Ming / Chan, Wah-Ho / Zhang, Jian-Ping / Cao, Ming (2007): Generic Process Mapping and Simulation Methodology for Integrating Site Layout and Operations Planning in Construction. In: Journal of Computing in Civil Engineering, v. 21, n. 6 (November 2007).
https://doi.org/10.1061/(asce)0887-3801(2007)21:6(453)
-
Morley, David / Lu, Ming / AbouRizk, Simaan (2014): Identification of Invariant Average Weighted Haul Distance to Simplify Earthmoving Simulation Modeling in Planning Site Grading Operations. In: Journal of Construction Engineering and Management, v. 140, n. 12 (Dezember 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000907
-
Liu, Chang / Lu, Ming (2015): Optimizing Earthmoving Job Planning Based on Evaluation of Temporary Haul Road Networks Design for Mass Earthworks Projects. In: Journal of Construction Engineering and Management, v. 141, n. 3 (März 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000940
-
Zhang, Hong / Li, Heng / Lu, Ming (2008): Modeling Time-Constraints in Construction Operations through Simulation. In: Journal of Construction Engineering and Management, v. 134, n. 7 (Juli 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:7(545)
-
Lu, Ming / Chen, Wu / Shen, Xuesong / Lam, Hoi-Ching / Liu, Jianye (2007): Positioning and tracking construction vehicles in highly dense urban areas and building construction sites. In: Automation in Construction, v. 16, n. 5 (August 2007).
https://doi.org/10.1016/j.autcon.2006.11.001
-
Liang, Xiong / Lu, Ming / Zhang, Jian-Ping (2011): On-site visualization of building component erection enabled by integration of four-dimensional modeling and automated surveying. In: Automation in Construction, v. 20, n. 3 (Mai 2011).
https://doi.org/10.1016/j.autcon.2010.10.002
-
Yi, Chaojue / Lu, Ming (2016): A mixed-integer linear programming approach for temporary haul road design in rough-grading projects. In: Automation in Construction, v. 71 (November 2016).
https://doi.org/10.1016/j.autcon.2016.08.022
-
Lau, Sze-Chun / Lu, Ming / Poon, Chi-Sun (2014): Formalized Approach to Discretize a Continuous Plant in Construction Simulations. In: Journal of Construction Engineering and Management, v. 140, n. 8 (August 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000872
-
Lu, Ming / Anson, Michael / Tang, S. L. / Ying, Y. C. (2003): HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong. In: Journal of Construction Engineering and Management, v. 129, n. 5 (Oktober 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:5(547)
-
Chan, Wah-Ho / Lu, Ming (2008): Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation. In: Journal of Construction Engineering and Management, v. 134, n. 4 (April 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:4(300)
-
Hadiuzzaman, Md. / Zhang, Yang / Qiu, Tony Z. / Lu, Ming / AbouRizk, Simaan (2014): Modeling the impact of work-zone traffic flows upon concrete construction: a high level architecture based simulation framework. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 2 (Februar 2014).
https://doi.org/10.1139/cjce-2013-0103
-
Shen, Xuesong / Lu, Ming (2012): A framework for indoor construction resources tracking by applying wireless sensor networks. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).
https://doi.org/10.1139/l2012-094
-
Lu, Ming / Zhang, Yang / Zhang, Jianping / Hu, Zhenzhong / Li, Jiulin (2009): Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 3 (März 2009).
https://doi.org/10.1139/l08-145
-
Li, Duanshun / Lu, Ming (2018): Integrating geometric models, site images and GIS based on Google Earth and Keyhole Markup Language. In: Automation in Construction, v. 89 (Mai 2018).
https://doi.org/10.1016/j.autcon.2018.02.002