-
Zhao, Yong / Zhu, Tingyu / Yu, Li / Lu, Ming (2024): Construction technology for deep tunnels crossing superhigh-temperature fault zones with high water surges. In: Frontiers of Structural and Civil Engineering, v. 18, n. 8 (Juli 2024).
https://doi.org/10.1007/s11709-024-1054-2
-
Hasan, Monjurul / Lu, Ming (2024): Enhanced model tree for quantifying output variances due to random data sampling: Productivity prediction applications. In: Automation in Construction, v. 158 (Februar 2024).
https://doi.org/10.1016/j.autcon.2023.105218
-
Lu, Ming / Song, Di / Shi, Da / Liu, Jing / Wang, Lu (2022): Effect of High-Rise Residential Building Layout on the Spatial Vertical Wind Environment in Harbin, China. In: Buildings, v. 12, n. 6 (7 Juni 2022).
https://doi.org/10.3390/buildings12060705
-
Mahdavian, Samin / Lu, Ming / Pereira, Estacio (2022): Application framework for safety-centric construction acceleration planning. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (März 2022).
https://doi.org/10.1108/ecam-03-2021-0195
-
Hasan, Monjurul / Lu, Ming (2021): Error Propagation Model for Analyzing Project Labor Cost Budget Risks in Industrial Construction. In: Journal of Construction Engineering and Management, v. 147, n. 4 (April 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002010
-
Lu, Ming / Du, Jiangtao (2019): Dynamic evaluation of daylight availability in a highly-dense Chinese residential area with a cold climate. In: Energy and Buildings, v. 193 (Juni 2019).
https://doi.org/10.1016/j.enbuild.2019.03.045
-
Wu, Bo / Lu, Ming / Huang, Wei / Lan, Yangbing / Wu, Yufang / Huang, Zonghui (2020): A Case Study on the Construction Optimization Decision Scheme of Urban Subway Tunnel Based on the TOPSIS Method. In: KSCE Journal of Civil Engineering, v. 24, n. 11 (September 2020).
https://doi.org/10.1007/s12205-020-1290-9
-
Lou, Wenjuan / Wang, Jiawei / Chen, Yong / Lv, Zhongbin / Lu, Ming (2016): Effect of motion path of downburst on wind-induced conductor swing in transmission line. In: Wind & Structures, v. 23, n. 3 (September 2016).
https://doi.org/10.12989/was.2016.23.3.211
-
Li, Duanshun / Lu, Ming (2019): Classical Planning Model-Based Approach to Automating Construction Planning on Earthwork Projects. In: Computer-Aided Civil and Infrastructure Engineering, v. 34, n. 4 (März 2019).
https://doi.org/10.1111/mice.12420
-
Tang, S. L. / Lu, Ming / Chan, Y. L. (2003): Achieving Client Satisfaction for Engineering Consulting Firms. In: Journal of Management in Engineering (ASCE), v. 19, n. 4 (Oktober 2003).
https://doi.org/10.1061/(asce)0742-597x(2003)19:4(166)
-
Lu, Ming / Du, Jiangtao (2013): Assessing the daylight and sunlight availability in high-density residential areas: a case in North-east China. In: Architectural Science Review, v. 56, n. 2 (Mai 2013).
https://doi.org/10.1080/00038628.2012.729311
-
Lu, Ming / Zhang, Yan / Xing, Jun / Ma, Wenda (2018): Assessing the Solar Radiation Quantity of High-Rise Residential Areas in Typical Layout Patterns: A Case in North-East China. In: Buildings, v. 8, n. 11 (November 2018).
https://doi.org/10.3390/buildings8110148
-
Lu, Ming / AbouRizk, S. M. / Hermann, Ulrich H. (2000): Estimating Labor Productivity Using Probability Inference Neural Network. In: Journal of Computing in Civil Engineering, v. 14, n. 4 (Oktober 2000).
https://doi.org/10.1061/(asce)0887-3801(2000)14:4(241)
-
Shen, Xuesong / Lu, Ming / Chen, Wu (2011): Computing Three-Axis Orientations of a Tunnel-Boring Machine through Surveying Observation Points. In: Journal of Computing in Civil Engineering, v. 25, n. 3 (Mai 2011).
https://doi.org/10.1061/(asce)cp.1943-5487.0000087
-
Dai, Fei / Lu, Ming / Kamat, Vineet R. (2011): Analytical Approach to Augmenting Site Photos with 3D Graphics of Underground Infrastructure in Construction Engineering Applications. In: Journal of Computing in Civil Engineering, v. 25, n. 1 (Januar 2011).
https://doi.org/10.1061/(asce)cp.1943-5487.0000072
-
Wu, Xiaodong / Lu, Ming / Shen, Xuesong (2016): Computational Approach to As-Built Tunnel Invert Survey Based on Processing Real-Time TBM Tracking Data. In: Journal of Computing in Civil Engineering, v. 30, n. 1 (Januar 2016).
https://doi.org/10.1061/(asce)cp.1943-5487.0000435
-
Lu, Ming / Anson, Michael (2004): Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:2(216)
-
Liu, Jing / Lu, Ming (2018): Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints. In: Journal of Construction Engineering and Management, v. 144, n. 7 (Juli 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001507
-
Lu, Ming / Wong, Lap-Chi (2007): Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA. In: Automation in Construction, v. 16, n. 1 (Januar 2007).
https://doi.org/10.1016/j.autcon.2005.12.001
-
Huang, Ziping / Broch, Einar / Lu, Ming (2002): Cavern roof stability—mechanism of arching and stabilization by rockbolting. In: Tunnelling and Underground Space Technology, v. 17, n. 3 (Juli 2002).
https://doi.org/10.1016/s0886-7798(02)00010-x
-
Mao, Dawei / Nilsen, Bjørn / Lu, Ming (2011): Analysis of loading effects on reinforced shotcrete ribs caused by weakness zone containing swelling clay. In: Tunnelling and Underground Space Technology, v. 26, n. 3 (Mai 2011).
https://doi.org/10.1016/j.tust.2011.01.004
-
Lau, Sze-Chun / Lu, Ming / Ariaratnam, Samuel T. (2010): Applying radial basis function neural networks to estimate next-cycle production rates in tunnelling construction. In: Tunnelling and Underground Space Technology, v. 25, n. 4 (Juli 2010).
https://doi.org/10.1016/j.tust.2010.01.010
-
Liu, Hexu / Al-Hussein, Mohamed / Lu, Ming (2015): BIM-based integrated approach for detailed construction scheduling under resource constraints. In: Automation in Construction, v. 53 (Mai 2015).
https://doi.org/10.1016/j.autcon.2015.03.008
-
Lu, Ming (2002): Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling. In: Journal of Construction Engineering and Management, v. 128, n. 5 (Oktober 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:5(438)
-
Dai, Fei / Lu, Ming (2010): Assessing the Accuracy of Applying Photogrammetry to Take Geometric Measurements on Building Products. In: Journal of Construction Engineering and Management, v. 136, n. 2 (Februar 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000114
-
Lu, Ming / Shen, Xuesong / Chen, Wu (2009): Automated Collection of Mixer Truck Operations Data in Highly Dense Urban Areas. In: Journal of Construction Engineering and Management, v. 135, n. 1 (Januar 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:1(17)
-
Lu, Ming / Poon, Chi-Sun / Wong, Lap-Chi (2006): Application Framework for Mapping and Simulation of Waste Handling Processes in Construction. In: Journal of Construction Engineering and Management, v. 132, n. 11 (November 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:11(1212)
-
Li, Duanshun / Lu, Ming (2017): Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach. In: Journal of Construction Engineering and Management, v. 143, n. 1 (Januar 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001214
-
Liu, Hexu / Singh, Gurjeet / Lu, Ming / Bouferguene, Ahmed / Al-Hussein, Mohamed (2018): BIM-based automated design and planning for boarding of light-frame residential buildings. In: Automation in Construction, v. 89 (Mai 2018).
https://doi.org/10.1016/j.autcon.2018.02.001
-
Soleimanifar, Meimanat / Shen, Xuesong / Lu, Ming / Nikolaidis, Ioanis (2014): Applying received signal strength based methods for indoor positioning and tracking in construction applications. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 8 (August 2014).
https://doi.org/10.1139/cjce-2013-0433