-
Kwok, Tai Wai / Chang, Siwei / Li, Heng: Understanding client satisfaction of prefabricated curtain wall in Hong Kong using XGBoost and Pearson correlation. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-03-2023-0276
-
He, Qiufeng / Wu, Zezhou / Li, Shenghan / Li, Heng / Wang, Ying (2022): Two decades of the evolution of China’s green building policy: insights from text mining. In: Building Research & Information, v. 51, n. 2 (November 2022).
https://doi.org/10.1080/09613218.2022.2142498
-
Alkaissy, Maryam / Arashpour, Mehrdad / Zeynalian, Mehran / Li, Heng (2022): Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes. In: Journal of Construction Engineering and Management, v. 148, n. 6 (Juni 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002269
-
Chen, Zhen / Agapiou, Andrew / Li, Heng / Xu, Qian (2021): A TRIZ Approach to Reliable Megaproject Sustainability. In: Frontiers in Built Environment, v. 7 (Januar 2021).
https://doi.org/10.3389/fbuil.2021.650699
-
Antwi-Afari, Maxwell Fordjour / Li, Heng / Seo, JoonOh / Anwer, Shahnawaz / Yevu, Sitsofe Kwame / Wu, Zezhou (2021): Validity and reliability of a wearable insole pressure system for measuring gait parameters to identify safety hazards in construction. In: Engineering, Construction and Architectural Management, v. 28, n. 6 ( 2021).
https://doi.org/10.1108/ecam-05-2020-0330
-
Li, Xiaoying / Li, Heng / Skitmore, Martin / Wang, Fan (2021): Understanding the influence of safety climate and productivity pressure on non-helmet use behavior at construction sites: a case study. In: Engineering, Construction and Architectural Management, v. 29, n. 1 (April 2021).
https://doi.org/10.1108/ecam-08-2020-0626
-
Li, Heng / Ma, Enlin / Lai, Jinxing / Wang, Lixin / Xu, Shuoshuo / Wang, Ke / Liu, Tong (2020): Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an. In: Advances in Civil Engineering, v. 2020 (Januar 2020).
https://doi.org/10.1155/2020/1854813
-
Wang, Zeli / Li, Heng / Yang, Xintao (2020): Vision-based robotic system for on-site construction and demolition waste sorting and recycling. In: Journal of Building Engineering, v. 32 (November 2020).
https://doi.org/10.1016/j.jobe.2020.101769
-
Scott, David / Cheong, Michael / Li, Heng (2003): Web-based Construction Information Management System. In: Australasian Journal of Construction Economics and Building, v. 3, n. 1 (November 2003).
https://doi.org/10.5130/ajceb.v3i1.2910
-
Li, Heng / Chan, Neo K. Y. / Skitmore, Martin (2012): The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. In: Construction Innovation, v. 12, n. 4 (Oktober 2012).
https://doi.org/10.1108/14714171211272207
-
King Chun, Chan / Li, Heng / Skitmore, Martin (2012): The use of virtual prototyping for hazard identification in the early design stage. In: Construction Innovation, v. 12, n. 1 (Januar 2012).
https://doi.org/10.1108/14714171211197481
-
Chen, Zhen / Li, Heng / Wong, Conrad T. C. (2003): Webfill before landfill: an e‐commerce model for waste exchange in Hong Kong. In: Construction Innovation, v. 3, n. 1 (März 2003).
https://doi.org/10.1108/14714170310814837
-
Luo, Xiaochun / Li, Heng / Wang, Hao / Wu, Zezhou / Dai, Fei / Cao, Dongping (2019): Vision-based detection and visualization of dynamic workspaces. In: Automation in Construction, v. 104 (August 2019).
https://doi.org/10.1016/j.autcon.2019.04.001
-
Li, Heng / Cao, J.-N. / Love, P. E. D. (1999): Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems. In: Journal of Construction Engineering and Management, v. 125, n. 5 (September 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:5(347)
-
Li, Heng / Love, Peter (1997): Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:3(233)
-
Cao, Yang / Li, Heng / Liang, Yong (2005): Using engineering drawing interpretation for automatic detection of version information in CADD engineering drawing. In: Automation in Construction, v. 14, n. 3 (Juni 2005).
https://doi.org/10.1016/j.autcon.2004.08.004
-
Kong, Stephen C. W. / Li, Heng / Liang, Yong / Hung, Tim / Anumba, Chimay / Chen, Zhen (2005): Web services enhanced interoperable construction products catalogue. In: Automation in Construction, v. 14, n. 3 (Juni 2005).
https://doi.org/10.1016/j.autcon.2004.08.008
-
Huang, Ting / Kong, C. W. / Guo, H. L. / Baldwin, Andrew / Li, Heng (2007): A virtual prototyping system for simulating construction processes. In: Automation in Construction, v. 16, n. 5 (August 2007).
https://doi.org/10.1016/j.autcon.2006.09.007
-
Li, Heng / Chan, Greg / Skitmore, Martin (2012): Visualizing safety assessment by integrating the use of game technology. In: Automation in Construction, v. 22 (März 2012).
https://doi.org/10.1016/j.autcon.2011.11.009
-
Li, Heng / Chan, Neo K. Y. / Huang, Ting / Skitmore, Martin / Yang, Jay (2012): Virtual prototyping for planning bridge construction. In: Automation in Construction, v. 27 (November 2012).
https://doi.org/10.1016/j.autcon.2012.04.009
-
Guo, H. L. / Li, Heng / Li, Vera (2013): VP-based safety management in large-scale construction projects: A conceptual framework. In: Automation in Construction, v. 34 (September 2013).
https://doi.org/10.1016/j.autcon.2012.10.013
-
Yan, Xuzhong / Li, Heng / Li, Angus R. / Zhang, Hong (2017): Wearable IMU-based real-time motion warning system for construction workers' musculoskeletal disorders prevention. In: Automation in Construction, v. 74 (Februar 2017).
https://doi.org/10.1016/j.autcon.2016.11.007
-
Li, Heng / Guo, Hongling / Skibniewski, Miroslaw J. / Skitmore, Martin (2008): Using the IKEA model and virtual prototyping technology to improve construction process management. In: Construction Management and Economics, v. 26, n. 9 (September 2008).
https://doi.org/10.1080/01446190802290477
-
Antwi-Afari, Maxwell Fordjour / Li, Heng / Yu, Yantao / Kong, Liulin (2018): Wearable insole pressure system for automated detection and classification of awkward working postures in construction workers. In: Automation in Construction, v. 96 (Dezember 2018).
https://doi.org/10.1016/j.autcon.2018.10.004
-
Li, Heng / Ma, Zhiliang / Shen, Qiping / Kong, Stephen (2003): Virtual experiment of innovative construction operations. In: Automation in Construction, v. 12, n. 5 (September 2003).
https://doi.org/10.1016/s0926-5805(03)00019-0