Gerold Lenz
- Challenges of slope design for high cut slopes in jointed rock masses. In: Geomechanics and Tunnelling, v. 17, n. 5 (Oktober 2024). (2024):
- Nachbrüche im Nahbereich von Störungen – Geotechnische Ursachen und Identifikation. In: Geomechanics and Tunnelling, v. 12, n. 6 (Dezember 2019). (2019):
- Short-term prediction of shotcrete utilization based on observations during tunnelling. In: Geomechanics and Tunnelling, v. 11, n. 3 (Juni 2018). (2018):
- Semmering Base Tunnel - Geotechnical models in design and construction. In: Geomechanics and Tunnelling, v. 11, n. 5 (Oktober 2018). (2018):
- Semmering Base Tunnel - Design and construction of the shaft head caverns under difficult conditions. In: Geomechanics and Tunnelling, v. 11, n. 5 (Oktober 2018). (2018):
- Prediction of fault zones based on geological and geotechnical observations during tunnel construction. In: Geomechanics and Tunnelling, v. 10, n. 4 (August 2017). (2017):
- Checking the system behaviour using a numerical model. In: Geomechanics and Tunnelling, v. 10, n. 4 (August 2017). (2017):
- Geotechnical monitoring as key safety management element at the Dürnstein/Wachau rockslide / Geotechnische Messungen als zentraler Bestandteil des Sicherheitsmanagementplans beim Felssturz Dürnstein/Wachau. In: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011). (2011):
- Is it possible to automate the Interpretation of Displacement Monitoring Data?. In: Felsbau, v. 25, n. 5 ( 2007). (2007):