Uroš Klanšek
- Active BIM system for optimized multi-project ready-mix-concrete delivery. In: Engineering, Construction and Architectural Management. :
- Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. In: Engineering, Construction and Architectural Management, v. 26, n. 10 (Oktober 2019). (2019):
- Using The Traveling Salesman Problem Solution for Optimal Route Scheduling in Construction Management. In: Organization, Technology and Management in Construction. :
- An integration of spreadsheet and project management software for cost optimal time scheduling in construction. In: Organization, Technology and Management in Construction, v. 9, n. 1 (Dezember 2018). (2018):
- Building Information Modeling Based Time And Cost Planning In Construction Projects. In: Organization, Technology and Management in Construction, v. 6, n. 1 ( 2014). (2014):
- (2018): Optimizacija građevinskih procesa – metode, alati i primjena. Construction process optimisation – review of methods, tools and applications. In: Građevinar, v. 70, n. 7 (September 2018).
- MINLP optimization of a composite I beam floor system. In: Steel and Composite Structures, v. 22, n. 5 ( 2016). (2016):
- Cost optimization of composite floor trusses. In: Steel and Composite Structures, v. 6, n. 5 (Oktober 2006). (2006):
- (2019): Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. In: Buildings, v. 9, n. 1 (Januar 2019).
- Mixed-Integer Nonlinear Programming Model for Nonlinear Discrete Optimization of Project Schedules under Restricted Costs. In: Journal of Construction Engineering and Management, v. 142, n. 3 (März 2016). (2016):