- Impact of AEC project organizational design on the mental health of project management practitioners (PMPs) in Australia. In: International Journal of Building Pathology and Adaptation. :
- PESTEL analysis of mental health management of project management practitioners (PMPs) in architecture, engineering and construction (AEC) project organization. In: Smart and Sustainable Built Environment, v. 12, n. 5 (Oktober 2022). (2022):
- Thermal performance of retrofitted secondary glazed windows in residential buildings – two cases from Australia. In: Smart and Sustainable Built Environment, v. 11, n. 4 (August 2021). (2021):
- Tackling stress of project management practitioners in the Australian construction industry: the causes, effects and alleviation. In: Engineering, Construction and Architectural Management. :
- Sustainable High-rise Design Trends – Dubai’s Strategy. In: Civil Engineering and Architecture, v. 1, n. 2 (August 2013). (2013):
- Exploring the role of networks in disseminating construction project knowledge through case studies. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017). (2017):
- Perceived benefits of retrofitted residential secondary glazing: an exploratory Australian study. In: International Journal of Building Pathology and Adaptation, v. 39, n. 5 (Dezember 2020). (2020):
- Public Private Partnership In China: Where To From Here. In: Organization, Technology and Management in Construction, v. 6, n. 3 ( 2014). (2014):
- Key relationship-based determinants of project performance in China. In: Building and Environment, v. 41, n. 7 (Juli 2006). (2006):
- Framework for Improving the Constructability of Raised Floor Systems in Australian Office Buildings. In: The International Journal of the Constructed Environment, v. 1, n. 1 ( 2011). (2011):
- The effects of the late 2000s global financial crisis on Australia's construction demand. In: Australasian Journal of Construction Economics and Building, v. 13, n. 3 (September 2013). (2013):
- Overview of alliancing research and practice in the construction industry. In: Architectural Engineering and Design Management, v. 8, n. 2 (Mai 2012). (2012):
- Neurofuzzy Decision Support System for Efficient Risk Allocation in Public-Private Partnership Infrastructure Projects. In: Journal of Computing in Civil Engineering, v. 24, n. 6 (November 2010). (2010):
- Model for Efficient Risk Allocation in Privately Financed Public Infrastructure Projects Using Neuro-Fuzzy Techniques. In: Journal of Construction Engineering and Management, v. 137, n. 11 (November 2011). (2011):
- Modeling Risk Allocation in Privately Financed Infrastructure Projects Using Fuzzy Logic. In: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 7 (Oktober 2009). (2009):
- Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australia. In: Journal of Construction Engineering and Management, v. 136, n. 2 (Februar 2010). (2010):
- Model for Fostering Trust and Building Relationships in China's Construction Industry. In: Journal of Construction Engineering and Management, v. 131, n. 11 (November 2005). (2005):