- Validation of SD Models for the Valuation of Exotic Options in Infrastructure Investment. In: Journal of Infrastructure Systems, v. 29, n. 2 (Juni 2023). (2023):
- Risk-Management System for Infrastructure-Condition Assessment. In: Journal of Infrastructure Systems, v. 1, n. 4 (Dezember 1995). (1995):
- Screening Cycle Decision Modeling for Infrastructure Management. In: Journal of Infrastructure Systems, v. 6, n. 4 (Dezember 2000). (2000):
- System Dynamics Models for the Valuation of Real Options in P3 Concession Project Agreements. In: Journal of Infrastructure Systems, v. 24, n. 1 (März 2018). (2018):
- Project Management Process Maturity (PM)2 Model. In: Journal of Management in Engineering (ASCE), v. 18, n. 3 (Juli 2002). (2002):
- Toward a New Paradigm: Simultaneous Use of Multiple Project Delivery Methods. In: Journal of Management in Engineering (ASCE), v. 16, n. 3 (Mai 2000). (2000):
- Strategies Adopted by International Architectural, Engineering, and Construction Firms in Southeast Asia. In: Journal of Professional Issues in Engineering Education and Practice, v. 134, n. 3 (Juli 2008). (2008):
- Schedule‐Based Construction Incentives. In: Journal of Construction Engineering and Management, v. 115, n. 3 (September 1989). (1989):
- Sequencing Knowledge for Construction Scheduling. In: Journal of Construction Engineering and Management, v. 117, n. 1 (März 1991). (1991):
- Systematic Automated Management Exception Reporting. In: Journal of Construction Engineering and Management, v. 119, n. 1 (März 1993). (1993):
- Work-Package–Process Model for Piping Construction. In: Journal of Construction Engineering and Management, v. 121, n. 4 (Dezember 1995). (1995):
- Quantitative Impacts of Project Change: Size Issues. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997). (1997):
- Project Delivery Systems and Project Change: Quantitative Analysis. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003). (2003):