-
Hanna, Awad S. / Blasier, Kelly / Aoun, Diane G. (2015): Risk Misallocation on Highway Construction Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 4 (November 2015).
https://doi.org/10.1061/(asce)la.1943-4170.0000176
-
Alaydrus, Achmad F. / Hanna, Awad S. / Russell, Jeffrey S. / Wortley, C. Allen (1995): Salvaging and Reusing Jacket and Deck Structures of Offshore Platforms. In: Journal of Infrastructure Systems, v. 1, n. 3 (September 1995).
https://doi.org/10.1061/(asce)1076-0342(1995)1:3(178)
-
Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. / Abotaleb, Ibrahim S. / El-adaway, Islam H. (2020): Quantitative Analysis of the Impacts of Out-of-Sequence Work on Project Performance. In: Journal of Construction Engineering and Management, v. 146, n. 8 (August 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001876
-
Hanna, Awad S. / Brusoe, Jacqueline Kazik (1997): Study of Performance Evaluations in Electrical Construction Industry. In: Journal of Management in Engineering (ASCE), v. 13, n. 6 (November 1997).
https://doi.org/10.1061/(asce)0742-597x(1997)13:6(66)
-
Hanna, Awad S. (2007): Risk Allocation and Increased Claims in the Construction Industry. In: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (Januar 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:1(43)
-
Hanna, Awad S. / Swanson, Justin (2007): Risk Allocation by Law—Cumulative Impact of Change Orders. In: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (Januar 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:1(60)
-
Hanna, Awad S. / Lotfallah, Wafik B. / Lee, Min-jae (2002): Statistical-Fuzzy Approach to Quantify Cumulative Impact of Change Orders. In: Journal of Computing in Civil Engineering, v. 16, n. 4 (Oktober 2002).
https://doi.org/10.1061/(asce)0887-3801(2002)16:4(252)
-
El Asmar, Mounir / Lotfallah, Wafik Boulos / Loh, Wei-Yin / Hanna, Awad S. (2012): Uncertainty Reduction in Multi-Evaluator Decision Making. In: Journal of Computing in Civil Engineering, v. 26, n. 1 (Januar 2012).
https://doi.org/10.1061/(asce)cp.1943-5487.0000119
-
El Asmar, Mounir / Lotfallah, Wafik Boulos / Loh, Wei-Yin / Hanna, Awad S. (2013): Reducing Bias and Uncertainty in Multievaluator Multicriterion Decision Making. In: Journal of Computing in Civil Engineering, v. 27, n. 2 (März 2013).
https://doi.org/10.1061/(asce)cp.1943-5487.0000206
-
Hanna, Awad S. / Camlic, Richard / Peterson, Pehr A. / Nordheim, Erik V. (2002): Quantitative Definition of Projects Impacted by Change Orders. In: Journal of Construction Engineering and Management, v. 128, n. 1 (Februar 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:1(57)
-
Hanna, Awad S. / Yeutter, Michael / Aoun, Diane G. (2014): State of Practice of Building Information Modeling in the Electrical Construction Industry. In: Journal of Construction Engineering and Management, v. 140, n. 12 (Dezember 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000893
-
Hanna, Awad S. / Tadt, Eric J. / Whited, Gary C. (2012): Request for Information: Benchmarks and Metrics for Major Highway Projects. In: Journal of Construction Engineering and Management, v. 138, n. 12 (Dezember 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000554
-
El Asmar, Mounir / Hanna, Awad S. / Loh, Wei-Yin (2013): Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems. In: Journal of Construction Engineering and Management, v. 139, n. 11 (November 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000744
-
Hanna, Awad S. (2012): Using the Earned Value Management System to Improve Electrical Project Control. In: Journal of Construction Engineering and Management, v. 138, n. 3 (März 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000426
-
Hanna, Awad S. / Mikhail, George / Iskandar, Karim A. (2017): State of Prefab Practice in the Electrical Construction Industry: Qualitative Assessment. In: Journal of Construction Engineering and Management, v. 143, n. 2 (Februar 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001236
-
Chang, Chul-Ki / Hanna, Awad S. / Lackney, Jeffery A. / Sullivan, Kenneth T. (2007): Quantifying the Impact of Schedule Compression on Labor Productivity for Mechanical and Sheet Metal Contractor. In: Journal of Construction Engineering and Management, v. 133, n. 4 (April 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:4(287)
-
Menches, Cindy L. / Hanna, Awad S. (2006): Quantitative Measurement of Successful Performance from the Project Manager's Perspective. In: Journal of Construction Engineering and Management, v. 132, n. 12 (Dezember 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1284)
-
El Asmar, Mounir / Lotfallah, Wafik / Whited, Gary / Hanna, Awad S. (2010): Quantitative Methods for Design-Build Team Selection. In: Journal of Construction Engineering and Management, v. 136, n. 8 (August 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000194
-
Hanna, Awad S. / Lee, Min-jae / Schoenfelder, Stephen M. / Lee, Chanyoung (2008): Temperature–density relationship of hot-mix asphalt pavement after completed rolling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 12 (Dezember 2008).
https://doi.org/10.1139/l08-099