-
Nasir, Hassan / Haas, Carl T. / Caldas, Carlos H. / Goodrum, Paul M. (2016): An Integrated Productivity-Practices Implementation Index for Planning the Execution of Infrastructure Projects. In: Journal of Infrastructure Systems, v. 22, n. 2 (Juni 2016).
https://doi.org/10.1061/(asce)is.1943-555x.0000275
-
Minooei, Farzad / Goodrum, Paul M. / Taylor, Timothy R. B. (2020): Young Talent Motivations to Pursue Craft Careers in Construction: The Theory of Planned Behavior. In: Journal of Construction Engineering and Management, v. 146, n. 7 (Juli 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001867
-
Jin, Haifeng / Nahangi, Mohammad / Goodrum, Paul M. / Yuan, Yongbo (2020): Multiobjective Optimization for Scaffolding Space Planning in Industrial Piping Construction Using Model-Based Simulation Programming. In: Journal of Computing in Civil Engineering, v. 34, n. 1 (Januar 2020).
https://doi.org/10.1061/(asce)cp.1943-5487.0000861
-
Shan, Yongwei / Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2016): Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (Januar 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000375
-
Karimi, Hossein / Taylor, Timothy R. B. / Goodrum, Paul M. / Srinivasan, Cidambi (2016): Quantitative analysis of the impact of craft worker availability on construction project safety performance. In: Construction Innovation, v. 16, n. 3 (Juli 2016).
https://doi.org/10.1108/ci-10-2015-0050
-
Albattah, Mohammed A. / Goodrum, Paul M. / Taylor, Timothy R. B. (2019): New Metric of Workforce Availability among Construction Occupations and Regions. In: Practice Periodical on Structural Design and Construction, v. 24, n. 2 (Mai 2019).
https://doi.org/10.1061/(asce)sc.1943-5576.0000413
-
Allmon, Eric / Haas, Carl T. / Borcherding, John D. / Goodrum, Paul M. (2000): U.S. Construction Labor Productivity Trends, 1970–1998. In: Journal of Construction Engineering and Management, v. 126, n. 2 (März 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:2(97)
-
Teicholz, Paul / Goodrum, Paul M. / Haas, Carl T. (2001): U.S. Construction Labor Productivity Trends, 1970–1998. In: Journal of Construction Engineering and Management, v. 127, n. 5 (Oktober 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:5(427)
-
Caldas, Carlos H. / Kim, Jung-Yeol / Haas, Carl T. / Goodrum, Paul M. / Zhang, Di (2015): Method to Assess the Level of Implementation of Productivity Practices on Industrial Projects. In: Journal of Construction Engineering and Management, v. 141, n. 1 (Januar 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000919
-
Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos / Zhai, Dong / Yeiser, Jordan / Homm, Daniel (2011): Model to Predict the Impact of a Technology on Construction Productivity. In: Journal of Construction Engineering and Management, v. 137, n. 9 (September 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000328
-
Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2009): Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 8 (August 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000024
-
Goodrum, Paul M. / Haas, Carl T. (2002): Partial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction Industry. In: Journal of Construction Engineering and Management, v. 128, n. 6 (Dezember 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:6(463)
-
Karimi, Hossein / Taylor, Timothy R. B. / Dadi, Gabriel B. / Goodrum, Paul M. / Srinivasan, Cidambi (2018): Impact of Skilled Labor Availability on Construction Project Cost Performance. In: Journal of Construction Engineering and Management, v. 144, n. 7 (Juli 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001512
-
Goodrum, Paul M. / Haas, Carl T. (2004): Long-Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level. In: Journal of Construction Engineering and Management, v. 130, n. 1 (Februar 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:1(124)
-
Goodrum, Paul M. / Zhai, Dong / Yasin, Mohammed F. (2009): Relationship between Changes in Material Technology and Construction Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 4 (April 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:4(278)
-
Dai, Jiukun / Goodrum, Paul M. / Maloney, William F. / Srinivasan, Cidambi (2009): Latent Structures of the Factors Affecting Construction Labor Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 5 (Mai 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:5(397)
-
Haas, Carl T. / Rodriguez, Ana Maria / Glover, Robert / Goodrum, Paul M. (2001): Implementing a multiskilled workforce. In: Construction Management and Economics, v. 19, n. 6 (Oktober 2001).
https://doi.org/10.1080/01446190110050936
-
Goodrum, Paul M. / Gangwar, Manish (2004): The relationship between changes in equipment technology and wages in the US construction industry. In: Construction Management and Economics, v. 22, n. 3 (März 2004).
https://doi.org/10.1080/0144619032000116543
-
Jones, Timothy / Shan, Yongwei / Goodrum, Paul M. (2010): An investigation of corporate approaches to sustainability in the US engineering and construction industry. In: Construction Management and Economics, v. 28, n. 9 (September 2010).
https://doi.org/10.1080/01446191003789465
-
Albattah, Mohammed / Shan, Yongwei / Goodrum, Paul M. / Taylor, Timothy R. B. (2017): Relationships between cycles of economic expansion in construction and craft workers' job satisfaction and preferences. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 1 (Januar 2017).
https://doi.org/10.1139/cjce-2016-0358
-
Goodrum, Paul M. / Miller, Jeffrey / Sweany, John / Alruwaythi, Omar (2016): Influence of the Format of Engineering Information and Spatial Cognition on Craft-Worker Performance. In: Journal of Construction Engineering and Management, v. 142, n. 9 (September 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001157
-
Shan, Yongwei / Goodrum, Paul M. / Zhai, Dong / Haas, Carl / Caldas, Carlos H. (2011): The impact of management practices on mechanical construction productivity. In: Construction Management and Economics, v. 29, n. 3 (März 2011).
https://doi.org/10.1080/01446193.2010.538070
-
Shan, Yongwei / Kim, Jung Yeol / Goodrum, Paul M. / Caldas, Carlos H. / Haas, Carl (2014): Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (Dezember 2014).
https://doi.org/10.1139/cjce-2014-0079
-
Dadi, Gabriel B. / Taylor, Timothy R. B. / Goodrum, Paul M. / Maloney, William F. (2014): Performance of 3D computers and 3D printed models as a fundamental means for spatial engineering information visualization. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 10 (Oktober 2014).
https://doi.org/10.1139/cjce-2014-0019