Wojciech Barcik
- (2022): Stress Ribbon Footbridge over the Bystrzyckie Lake in Zagórze Śląskie – Design and Construction. Vorgetragen bei: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- (2017): Extradosed Bridges in Poland—Design and Construction. In: Frontiers in Built Environment, v. 2 (Januar 2017).
- (2012): Cable-stayed Bridge over the Odra River in Wroclaw, Poland. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- two largest Polish concrete bridges – design and construction. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 169, n. 4 (Dezember 2016). (2016):
- Rędziński Bridge in Wrocław—The Largest Concrete Cable-Stayed Bridge in Poland. In: Structural Engineering International, v. 24, n. 2 (Mai 2014). (2014):
- Footbridges on the river Odra's Island in Wroclaw. Vorgetragen bei: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- New footbridges in Poland. Vorgetragen bei: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- Dynamic sensibility of cable stayed footbridges. Vorgetragen bei: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- (2016): Examples of Polish Extradosed Bridges – Design and Construction. Vorgetragen bei: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- Conceptual Design of a Footbridge in the Historical Part of Wrocław. Vorgetragen bei: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal. (2008):
- Bridge Engineering in Poland. In: (2013): Handbook of International Bridge Engineering. CRC Press, Boca Raton (USA), ISBN 978-1439810293. (2013):
- Conceptual designs of two stress ribbon footbridges over the Bystrzyckie Lake in Zagorze Slaskie and over the Bug River in Niemirow, Poland. Vorgetragen bei: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- (2008): Curved cable-stayed bridges. Vorgetragen bei: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.
- (2007): Bridges along highway ring road of Wroclaw. Vorgetragen bei: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007.