Puttesund-Brücke
- Assessment and strengthening of two cantilever-type concrete bridges. Vorgetragen bei: IABSE Symposium: Long-Span and High-Rise Structures, Kobe, Japan, September 1998, S. 293-298. (1998):
- Raising expectations: a cantilever bridge becomes a cable-stayed crossing. In: Bridge Design & Engineering, v. 9, n. 30 (1. Quartal 2003), S. 31-32. (2003):