Mersey Gateway Bridge - Movable Scaffolding System Trinity Trial Launches - September 2015
The trial shows the MSS deck sections being dropped to separate each beam, then each section is moved sideways, then forwards and backwards. The short clip at the end is the nose being moved from side to side - it needs to do this to get round the gentle curve in the approach viaduct.
|
Weitere Medien zu diesem Bauwerk |