FIU-Sweetwater Bridge Move - Full Time-Lapse
Un-edited version of the move of a 950-Ton 174-foot long pedestrian bridge the morning of Saturday, March 10, 2018. Designed by Figg Bridge Engineers, Constructed by MCM USA and Moved by Barnhart Crane & Rigging. Funded by USDOT/FHWA TIGER and FDOT TAP grants. The project has already generated very significant private sector development in Sweetwater. Shot on a GoPro Hero 4 Black at one 4K frame every 2 seconds (+60 X speed) with a TurnsPro rotating camera mount set to turn 75 degrees in 5 hours. Music is "Passing Time" by Kevin MacLeod from the TouTube Library.
|
Weitere Medien zu diesem Bauwerk |