What does building information modelling (BIM) really look like? Leeds Flood Alleviation Scheme, a case study.
Autor(en): |
Daniel Patten
(Ove Arup & Partners, Leeds, UK)
|
---|---|
Medium: | Tagungsbeitrag |
Sprache(n): | Englisch |
Tagung: | IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017 |
Veröffentlicht in: | IABSE Conference Bath, April 19-20, 2017 |
Seite(n): | 169-170 |
Jahr: | 2017 |
DOI: | 10.2749/222137817821232900 |
Abstrakt: |
A flood alleviation scheme extending 3.5 km to protect Leeds City Centre against flooding up to a standard of protection of 1 in 75 years. The scheme consisted of linear defences, innovative movable weirs and improvements to river conveyance. The project implemented BIM in the form of a common data environment and digital workflows. An interactive BIM model was developed for the client to help organise files relating to specific structures along the scheme. |
Stichwörter: |
BIM
|
Vorschau herunterladen (PDF-Datei)
0.13 MB
Anzeige
Anzeige
0.13 MB
- Über diese
Datenseite - Reference-ID
10292788 - Veröffentlicht am:
27.01.2019 - Geändert am:
21.05.2021