0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Use of Digitization for the Design of a Railway Arch Bridge in Azerbaijan

 Use of Digitization for the Design of a Railway Arch Bridge in Azerbaijan
Autor(en): , , , ,
Beitrag für IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, veröffentlicht in , S. 213-220
DOI: 10.2749/istanbul.2023.0213
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.84 MB

For several years, and to an increasing extent, BIM techniques have yet been used by Yüksel Proje for the design process of their projects. One of these projects is the Shusha Bridge in Azerbaijan,...
Weiterlesen

Bibliografische Angaben

Autor(en): (ALLPLAN Software Engineering GmbH Graz, Austria)
(ALLPLAN Software Engineering GmbH Graz, Austria)
(ALLPLAN Software Engineering GmbH Graz, Austria)
(Yüksel Proje A.S., Ankara, Turkey)
(Yüksel Proje A.S., Ankara, Turkey)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Veröffentlicht in:
Seite(n): 213-220 Anzahl der Seiten (im PDF): 8
Seite(n): 213-220
Anzahl der Seiten (im PDF): 8
Jahr: 2023
DOI: 10.2749/istanbul.2023.0213
Abstrakt:

For several years, and to an increasing extent, BIM techniques have yet been used by Yüksel Proje for the design process of their projects. One of these projects is the Shusha Bridge in Azerbaijan, where, due to its complex geometry, several challenges arose in choosing the right procedures for an efficient application of the used modelling software. A whole series of parametric techniques had to be applied to suitably capture the various structural components. The variability of the geometry of the individual components as well as the detailed tendon layout were recorded with using tables and formulas assigned to the geometric parameters. Advanced techniques such as using Excel sheets and TCL programming complemented the spectrum of applied functionality. Python parts were used for reinforcement modelling and outright assignment of IFC attributes supported data exchange and interoperability.

Stichwörter:
Brückenentwurf

Bauwerke und Projekte

Geografische Orte